Similar Projects
Road Runner #1043 Renovation
Addition, Renovation, Infrastructure
Design
$800,000 CJ est. value
Bryant, AR 72022

Abbey Road Shopping Center
New Construction, Infrastructure - 7,500 SF
Design
$2,000,000 CJ est. value
Bryant, AR 72022

Mill and Asphalt Overlay of East Sevier Street
Infrastructure
Post-Bid
Benton, AR 72015

High Performance Cold Mix
Infrastructure
Post-Bid

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Springlake Roundabout
Infrastructure
Results
Benton, AR

Lombard Heights
New Construction, Infrastructure
Construction
$48,000,000 CJ est. value
Bryant, AR 72022

Midtown Bryant - Phase 3
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bryant, AR 72022

Aria Convenience Store
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Bryant, AR 72022

Main Street Rehabilitation Sidewalk Project
Infrastructure
Post-Bid
Benton, AR

Statewide CLRS Improvements
Infrastructure
Results

Benjamin Grove Phase 4
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bryant, AR 72022

Asbestos Abatement
Term Contract, Infrastructure
Post-Bid
$87,000 CJ est. value
Bryant, AR 72022

Haskell Overlay and Surfacing (S)
Infrastructure
Results
Haskell, AR

Olde Salem Township Phase 2
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Bryant, AR 72022

Last Updated 03/08/2023 02:31 PM
Project Title

Pinnacle Point at Bryant

Physical Address View project details and contacts
City, State (County) Alexander, AR 72002   (Saline County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 8, 2023, this project is under construction. Construction began in the fourth quarter of 2021. Information regarding a general contractor has not been disclosed.

Details

2 Stories Above Grade, 82,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents