Similar Projects
BEX V And BTA V Capital Levy Renovation
Renovation, Addition
Conception
Seattle, WA

$MUNI-CIP-SR 169 Widening- 4-city of Maple Valley
Infrastructure
Conception
$15,500,000 CJ est. value
Maple Valley, WA 98038

2023 Small Works Roster
Term Contract
Design
$350,000 CJ est. value
Snoqualmie, WA 98065

John Rogers Elementary School Replacement Project
Renovation
Design
$3,500,000 CJ est. value
Seattle, WA 98125

Briarcrest ES Modernization
Build-out, Renovation
Bidding
$7,700,000 CJ est. value
Shoreline, WA 98155

Sherwood Forest Elementary Safety and Security Updates
Renovation, Alteration - 62,638 SF
Post-Bid
$590,000 est. value
Bellevue, WA 98007

Graham Hill Elementary School Seismic and Door Improvements
Renovation
Post-Bid
$900,000 to $110,000 est. value
Seattle, WA 98118

North Queen Anne School
Renovation
Results
Seattle, WA 98134

Alki Elementary Modernization and Replacement Project
Renovation
Results
$43,000,000 est. value
Seattle, WA 98116

12th Avenue Apartment Building
New Construction, Infrastructure - 103,312 SF
Pending Verification
$29,300,000 CJ est. value
Seattle, WA 98122

Renton Avenue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Seattle, WA 98178

School Construction - 2022 Bond - Renton School District
Renovation
Conception
$676,000,000 CJ est. value
Renton, WA 98057

Lakeridge Elementary Interior and Vestibule Improvements
Renovation - 1,000 SF
Post-Bid
$797,000 est. value
Seattle, WA 98178

Montlake Elementary Modernization and Addition Project
Renovation, Addition
Results
$42,000,000 est. value
Seattle, WA 98112

Construction Manager - Montlake Elementary School Modernization and Addition
Renovation, Addition - 87,447 SF
Post-Bid
$64,800,000 est. value
Seattle, WA 98112

Last Updated 05/22/2023 04:01 PM
Project Title

Early Learning Center

Physical Address View project details and contacts
City, State (County) Bellevue, WA 98007   (King County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 22, 2023 the project is seeking final city approvals. Information regarding a general contractor has not been provided. A construction timeline has not been confirmed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents