Similar Projects
Air Conditioner Duct Installation for Crawford, Flores/Zapata, Gorena and Ramirez Elementary Schools
Bidding
Edinburg, TX 78541

Wall Mounted Air Conditioners
Post-Bid
Edinburg, TX 78539

IT Complex NOC Chiller Replacement
Post-Bid
Edinburg, TX 78540

Esparza Elementary Purchase of Chilled Water, Roof Top, AC Units
Results
Edinburg, TX 78542

Alamo Youth Center Air Conditioning Replacements
Results
Less than $74,250 est. value
Alamo, TX 78516

Longoria Middle School Chiller
Post-Bid
Edinburg, TX 78541

HVAC Refrigerants for Central Supply Warehouse
Results
Less than $50,000 est. value
Pharr, TX 78577

Replacement of HVAC Controls at Weslaco East High School
Post-Bid
Weslaco, TX 78596

PSJA ISD Clover, Garcia and Doedyns Elementary Schools HVAC Additions to Hallways
Results
Less than $2,600,000 est. value
Lopezville, Pharr, TX 78589

CNP Chiller/Condenser
Post-Bid
Mission, TX 78572

Air Conditioner Units
Results
Edinburg, TX 78539

Inspections, Maintenance and Repair of Centrigugal Chillers, Scroll Compressor and Reciprocating Compressor, Screw Compressors and Package Chillers District-Wide
Term Contract
Post-Bid
Pharr, TX 78755

Outdoor Walk-In Cooler/Freezer Combination for Lenoir Elementary School
Term Contract
Results
Donna, TX 78537

Bentsen Elementary HVAC Upgrade
Post-Bid
McAllen, TX 78503

Swimming Pool Gas Boilers
Term Contract
Results
Less than $48,900 est. value
Edinburg, TX 78539

Last Updated 10/01/2020 02:57 PM
Project Title

Mcallen City Hall Chiller and Boiler Replacements

Physical Address View project details and contacts
City, State (County) McAllen, TX 78501   (Hidalgo County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $205,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the demolition of the existing air cooled split chiller and respective condensing units as well as the demolition of the existing hydronic boiler. The new equipment will be a new packaged air cooled chiller mounted on the existing roof along with new chilled water lines routed along the roof and connecting to the existing chilled water piping. Two new hydronic boilers will be installed in the penthouse connected to existing hydronic lines and gas piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents