Similar Projects
JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Smith Technology Building Cooling Tower Replacement
Results
Less than $500,000 est. value
Greensboro, NC

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

McIver HVAC Addition for McIver School
Results
Greensboro, NC 27405

Construction of Ductwork Modifications
Post-Bid
Greensboro, NC 27411

IRC Building Chiller Replacement
Results
Less than $500,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

Chiller Maintenance for the Engineering and Inspections Department
Term Contract
Results
Greensboro, NC 27401

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Cone ES RTU Replacement
Post-Bid
Greensboro, NC 27405

High Point Mental Health HVAC Renovations
Results
High Point, NC 27260

Pleasant Garden Cooling Tower Replacement
Post-Bid
Pleasant Garden, NC 27313

Reported 02/24/2021 12:00 AM
Project Title

Chiller Plant Replacement for Southern Elementary School

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27406   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish the existing cooling tower, 120T chiller, condenser water pump, chilled water pump including all piping modifications, electrical modifications, makeup water modifications, and controls modifications. Provide a new packaged air cooled chiller on a new concrete equipment pad in the yard beside the Mechanical Room. Provide new chilled water pumps, air separator, makeup water circuit and all piping and insulation for new chilled water piping. Flush, fill and vent system and provide cleaner and water treatment for the entire closed chilled water system. Provide electrical modifications to accommodate the new work and replace lighting in the Mechanical Room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents