Similar Projects
750,000 Gallon NW Area Tower
Infrastructure
Bidding
Faribault, MN

1.5 MG High Pressure Zone Water Tower
Infrastructure
Bidding
Rogers, MN

2021 Cleaning, Repairing, Painting 1,500,000 Gallon Elevated Water Storage Tank, Tower Number One
Post-Bid
Golden Valley, MN

Regional Drinking Water Project Contract C - Elevated Water Tower
New Construction
Post-Bid
Cloquet, MN 55720

Park Glen Road Water Tower Rehabilitation
Results
Saint Louis Park, MN 55416

Water Storage Tank Rehabilitation
Results
Less than $1,120,820 est. value
Minnetonka, MN

West 10MG Reservoir Rehabilitation
Post-Bid
Bloomington, MN 55420

Chattanooga Water Tower
Results
$700,000 est. value
Saint Charles, MN

Water Storage Tank Rehabilitation, 150,000-Gallon Spheroid WT No. 1
Post-Bid
Hoyt Lakes, MN

Cope Avenue Tank Repairing and Painting
Results
Saint Paul, MN 55109

MPCA: Condensate Tank Repair
Renovation
Post-Bid
Hopkins, MN 55343

Water Tower Coatings
Results
$300,000 to $400,000 est. value
Fairmont, MN

Wheel Loader Broom, Sprayer, and Water Tank System
Term Contract
Post-Bid
Crookston, MN

Water Storage Tank Rehabilitation-Railway Street Elevated Tank
Results
Waldorf, MN 56091

2500 Gallon Double Wall Tanks
Infrastructure
Post-Bid
Willmar, MN

Last Updated 07/03/2021 02:24 AM
Project Title

New 2.0 MG Water Storage Tanks

Physical Address View project details and contacts
City, State (County) Brainerd, MN   (Crow Wing County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing concrete and steel ground storage tanks on site at the Water Treatment Facility. Site water main improvement. Site work. Two new 1.0 MG concrete water storage facilities (cast in place). Architectural concrete form liner features. Process and valve control room. Passive tank mixing system. Associated electrical and mechanical features. Site landscaping.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents