Similar Projects
SMD Services IDIQ for V/C Floor Tile in Apartments and Public Space-Citywide
Term Contract
Sub-Bidding
New York, NY 10007

V/C Floor Tile Installation
Alteration
Post-Bid
Queens, NY 11101

V/C Floor Tile Installation
Alteration
Post-Bid
Queens, NY 11691

Roof, HVAC and Ceiling
Term Contract, Alteration
Results
Queens, NY 11365

Basement Restroom
Renovation, Demolition
Results
$50,000 to $500,000 est. value
New York, NY 10036

Bathtub Glazing
Term Contract, Alteration
Post-Bid
Staten Island, NY

Stabilization of North and South Gable Walls at DSNY Queens District 1
Alteration
Results
Queens, NY 11106

Design-Build Ballistic Rated Podium
Alteration
Post-Bid
$25,000 to $100,000 est. value
New York, NY 10007

IS503K - Ceiling Repair
Alteration
Results
$1,500,001 to $4,000,000 est. value
New York, NY

Bathtub Wall Surrounds & Ancillary Work
Term Contract
Post-Bid
$50,000 to $999,000 est. value
New York, NY 10065

HS520M - Ventilation/Auditorium Ceiling Replacement
Alteration
Results
$4,000,000 est. value
New York, NY 10038

Partition Repairs
Alteration
Post-Bid

Interior Painting, Plastering and Patching - Multi-year Requirements Contract
Term Contract
Post-Bid
New York, NY

Requirements Contract for Replacement and Installation of Vertical Safety Padding
Alteration
Post-Bid
New York, NY

SMD Services IDIQ Contract for Plaster Restoration at Various Developments Citywide
Term Contract
Post-Bid
New York, NY

Last Updated 10/20/2022 06:02 PM
Project Title

Reconstruction of Primary Tanks, Wards Island Waste Water Treatment Plant

Physical Address View project details and contacts
City, State (County) New York, NY 10035   (New York County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $123,296,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 20, 2022, most of the trade work is awarded. The job team is soliciting quotes on an as needed basis. Reconstruction of Primary Settling Tank (PST) Nos. 2201 through 2210, including, but not necessarily limited to, the following: 1. Removal and disposal of hazardous material. 2. Draining, removal of debris, and cleaning of each PST, including associated scum pits. 3. Rehabilitation of existing structural concrete deficiencies including the repair of cracks, spalls, and expansion joints in the PSTs and the corresponding scum pits. 4. Demolition and removal of the existing longitudinal and cross sludge collector mechanisms, including, but not limited to, flights, wearing shoes, flight chains, drive chains, drive units with motors, gear reducers, bevel gears, sprockets, shafts, wall bearings, collars, floor rails, upper and lower return rails, upper and lower return rail support systems, anchor bolts, local control stations and other appurtenances. 5. Demolition and removal of the existing tank drain slide gates, wall thimbles, floor stand operators, anchor bolts, and appurtenances. 6. Demolition and removal of the existing primary tank influent gates, frames, floor stand operators, anchor bolts, and appurtenances. 7. Demolition and removal of the existing target baffles. 8. Demolition and removal of the existing effluent weir plates. 9. Provision of new longitudinal and cross sludge collector mechanisms for each PST, including, but not limited to, flights, wearing shoes, flight chains, drive chains, drive units with motors, gear reducers, bevel gears, sprockets, shafts, wall bearings, collars, floor rails, upper and lower floor rails, upper and lower return rail support systems, anchor bolts, local control stations and other appurtenances. 10. Provision of new tank drain slide gates and floor stand operators. 11. Provision of new primary tank influent gates, frames, floor stand operators, anchor bolts, and appurtenances. 12. Provision of new target baffles. 13. Provision of new effluent weir plates. 14. Demolition and removal of the existing scum dipping troughs, wall thimbles, embedded pipe, anchor bolts, manual operators, and appurtenances. 15. Provision of new, automated, chain-driven scum dipping troughs with modulating electric actuators, gear reducers, and local control stations for each PST, including, but not limited to new power and control wire, conduit, wall thimbles, anchor bolts, embedded pipe, and accessories. 16. Demolition and removal of the existing exterior light fixtures and poles. 17. Demolition and removal of existing walkway slabs and curbs at locations of new light poles. 18. Provision of new exterior light fixtures and poles at new walkway slabs. 19. Removal of concrete slabs-on-ground between Pre-Houses and scum pits. 20. Provision of new concrete slabs between Pre-Houses and scum pits. 21. Demolition and removal of the existing scum decant piping, fittings, valves, gates, wall thimbles, anchorages, anchor bolts, and appurtenances. 22. Provision of new scum drain gates, wall thimbles, telescoping weir and telescoping weir base support elbow, anchorages, floor stand operators, and anchor bolts. 23. Demolition of the 8-in. diameter drain from each scum pit to the 20-in. drain in the pipe gallery, including (but not limited to): excavation, bracing, dewatering, and backfilling 24. Separate temporary pumping of the 20-in. Plant Drain at each Pre-House. 25. Provision of a new 10-in. drain from each scum pit to the existing 20-in plant drain under the floor slab in the gallery. 26. Demolition, Repair, and Provision of new stainless steel handrails. 27. Demolition and removal of the existing hydraulic bucket cranes for each scum pit. 28. Provision of new hydraulic bucket cranes for each scum pit. 29. Provision of new hydraulic bucket cranes for each scum pit Upgrade Preliminary Sludge Pumping Station/Pre-House Nos. 1 through 5 1. General Demolition, removal, and replacement of Electrical Equipment / conduit, HVAC equipment, and Plumbing equipment. 2. General Demolition, removal, and replacement of Roofing, Masonry, Precast Planks, concrete floors and walls, Architectural work. 3. Provision of an air lock vestibule at the North end of the Pipe Gallery. 4. Removal and replacement of compressed air system 5. Provision of a new package service water system. 6. Demolition & replacement of the existing fifteen (15) Primary Sludge Pumps. Site Restoration, Including: 1. Civil work 2. Demolition and restoration of the existing Plant roads, curbs, and sidewalks in the vicinity of the PST 3. Installation of new yard hydrants at each Pre-House and scum pit Project has a 20% DBE Goal

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents