Similar Projects
Reported | 12/08/2021 12:00 AM |
Project Title | Lummi Nation Seapond Dike Repair and Armoring |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: WA |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Owner |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is to repair the outside of the existing Lummi sea pond dike and to provide protection from future wave/rain/wind damage. Work involves construction of temporary access features, placement of 37,000 ton of rock in a combination of 2, 3, and 4 man rock, Heavy Loose Rip Rap, and quarry spalls on the dike and 750 ton of 1-1/4" Crushed surface base course to fill roadway areas that have been washed out along 6,164 linear feet of the outer dike |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |