Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

AWTP Chlorine Scrubber System
Renovation
Bidding
Macon, GA 31211

Costruction of Modifications to the WPCP
Renovation
Bidding
Richland, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Ridgewood Water Production Facility
Results
Brunswick, GA 31520

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

James E Quarles Water Treatment Plant Taste And Odor
Renovation, Alteration
Bidding
$2,500,000 est. value
Marietta, GA 30068

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Pump Repair Service
Term Contract
Results
Atlanta, Chamblee, Decatur, Ellenwood, Lithonia, Snellville, Stone Mountain, Tucker, GA

Water Softening System
Infrastructure
Bidding
Mount Vernon, GA

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Crosstown Raw Water Pump VFD Replacement
Results
Less than $37,150 est. value
Peachtree City, GA 30269

Scott Candler WTP Electrical Building No. 2 Structural Design Improvements And Distribution System Panels Installation
Renovation
Bidding
Doraville, GA 30360

Gill Street Well Improvements
Post-Bid
Ellaville, GA

Last Updated 08/23/2021 08:20 AM
Project Title

Drinking Water Filteration System

Physical Address View project details and contacts
City, State (County) Waynesboro, GA   (Burke County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals for a drinking water filtration system for the City’s proposed well and treatment facility site located on Highway 56 in Waynesboro, GA. The proposed well and water treatment facility location and site plan are shown in the attached Figure C4. The proposed well will flow 1,300 gpm of raw water to the treatment facility and then directly into a 16-inch ductile iron watermain which flows to City customers. A raw water sampling analysis report is also attached.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents