Similar Projects
Last Updated | 05/10/2023 05:02 PM |
Project Title | Moyer Building Medium Density Fibreboard (MDF) Cooling Replacement |
Physical Address | View project details and contacts |
City, State (County) | Powell, WY 82435 (Park County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes and consists of: furnishing all labor, operations, materials, accessories, incidentals, services, and equipment for work on the specific aforementioned project. The specific Work includes: furnishing all labor, means and methods, materials Demo of the existing unused Mechanical Equipment, dividing wall, Electrical infrastructure changes, and relocation of equipment. Installation of new Rooftop units. Materials and/or work not specifically mentioned which are necessary in order to provide a complete project shall be included in the Bid and shall conform to all Local, State, and Federal requirements in accordance with the requirements, terms, specifications, conditions, and provisions hereinafter contained. Disruptive work shall not commence no sooner than May 15, 2023 and shall be substantially completed no later than August 14, 2023, final completion by August 21, 2023. The sealed bids shall reference: Moyer Building MDF Cooling Replacement. Questions regarding the technical aspects or requirements of the Contract Documents are to be referred to the Project Manager, Kane Morris, Point Architects, Cody, Wyoming, 307-272-4006. Bidders and subcontractors or Bidders representative are required to attend and participate in the conference. Failure to do so will result in disqualification of the bid which will be returned unopened to the Bidder. In determining the lowest responsive proposal, The Owner will consider cost as a primary criterion in addition to whether the bidder is a responsible bidder. Northwest College, reserves the right to reject any and/or all bids and to waive any informalities if deemed in the best interest of the Owner. No bid will be considered unless accompanied by the required bid guarantee of 5% of the total bid amount. The bid guarantee amount shall be forfeited if the bidder is awarded the Contract and fails to enter into a Contract with the Owner. The Successful Bidder will be required to provide payment and performance bonds in an amount of at least 100% of awarded contract price. Dated this 11 day of January, 2023 Northwest College /s/ owner The college shall reserve the right to reject any or all bids and to waive irregularities and informalities in the bidding process or to accept any bid which in its sole and absolute judgment, under the circumstance, best serves the districts interest. Where applicable, preference will be given to Wyoming contractors as provided in Wyoming Statute 9-8-301 (1977) et seq. Northwest College does not discriminate on the basis of sex, handicapping condition, race, color, national origin, or age in its educational program and activities or in its personnel procedure. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |