Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

Widening on the Southwest Turn Corner of SH392 and CR55
Alteration
Bidding
$1,000,000 est. value
Gill, Greeley, CO 80624

Highway 72 Widening
Infrastructure
Bidding
$365,000 est. value
Arvada, CO 80007

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

General On-Call Asphalt Infrared Repair Services
Post-Bid
Eagle, CO

Road Overlays Program
Results
$150,000 to $200,000 est. value
Fruita, CO 81521

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Outdoor Vehicle Storage
New Construction
Pending Verification
Fort Collins, CO 80524

Bonaventure Court Asphalt and Concrete Repairs
Infrastructure
Bidding
$300,000 est. value
Colorado Springs, CO

NIWOT Sanitation District Office and Entry Asphalt Replacement Improvements
Post-Bid
Niwot, CO 80504

Hidden Valley Parkway Extension
Results
$1,000,000 to $1,500,000 est. value
Severance, CO 80546

Road Resurfacing AFR1-AFR2 Construction Management
Infrastructure
Bidding
$320,000 est. value
Colorado Springs, CO

2021 Asphalt Rejuvenating Agent Project
Post-Bid
Montrose, CO

Cityworks/ESRI integration for Pavement Management
Results
Loveland, CO 80537

West Legacy Park Phase II Project
Post-Bid
Delta, CO 81416

Last Updated 05/28/2022 04:26 AM
Project Title

Hot Mix Asphalt Pavement (Overlay) Project 2022

Physical Address View project details and contacts
City, State (County) CO   (Routt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work to provide instructions and assistance in submitting a bid response to provide hot mix asphalt pavement (overlay) over existing roadways for Routt County. a) Attachment A is the Excel Bid Response Sheet. Please ensure the formulas in Excel Spread sheet are accurate. b) Attachment B is the Map. c) Attachment C is Hot Mix Asphalt Specifications. d) Attachment D is MGPEC Form #9. e) We have a 5% over estimate on the tonnage built into the calculations f) All tonnage for aprons has been included within the final tonnage (if applicable) g) Routt County does not have a permitted Hot Plant site available for use h) Traffic control will be required for any work at the aprons

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents