Last Updated | 10/09/2020 11:42 AM |
Project Title | Water and Sewer Interconnect - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Fox Lake, IL 60020 (Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Package 1 – Water and Sewer Pipeline Improvements PART A: WATER MAIN IMPROVEMENTS: Labor, equipment, services, and materials necessary for the construction of 16-inch, 12-inch, 10-inch., and 8-inch water main, including: trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main and services; pipe bedding; trench backfill; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required. PART B – SANITARY SEWER AND FORCE MAIN IMPROVEMENTS: Labor, equipment, services, and materials necessary for the construction of 24-inch and 8-inch sanitary sewer, and 10-inch force main, including: trench excavation; sanitary sewer and force main pipe materials and installation; sanitary manholes; sewage air release valves in vaults; pipe bedding; trench backfill; traffic control; sanitary sewer leakage testing; force main pressure testing; and all other work necessary for a complete and functional sanitary sewer and force main installations as shown, specified, or required. PART C – SURFACE RESTORATION IMPROVEMENTS: Labor, equipment, services, and materials necessary for the restoration of surfaces disrupted by the construction of the water main, sanitary sewer, and force main improvements, including: pavement removal and replacement; curb and gutter removal and replacement; sidewalk removal and replacement; parkway restoration; wetland restoration; landscaping; and all other work necessary for a complete and functional restoration of surfaces disturbed by construction as shown, specified, or required. Package 2 – Tall Oaks Lift Station LIFT STATION CONSTRUCTION: Work description: Provide all equipment, labor and appurtenances required furnish and install the Tall Oaks Lift Station including pumps, electrical, control system, piping, concrete structures, new electrical service, gas service, and transfer switch. The work will be financed through the Illinois EPA Revolving Loan program, and American Iron and Steel provisions will apply to the project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |