Similar Projects
Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Cactus Middle School Site Improvements
Post-Bid
Casa Grande, AZ 85122

Site Preparation for AMARG Tension Fabric Structures
Post-Bid
Tucson, AZ 85707

Hudson Point Comm Site Ground Sys Installation
Results
$25,000 to $100,000 est. value
Phoenix, AZ

Grading and Drainage Project at Ray High School
Results
$198,750 est. value
Kearny, AZ

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Green Valley Park ADA Site Improvements
Post-Bid
Payson, AZ

Off-Highway Vehicle Staging Area
Results
Less than $680,000 est. value
Quartzsite, AZ

The Post at Cooley Station - Site Work
New Construction
Construction
Gilbert, AZ 85295

Bore Drilling
Infrastructure
Post-Bid
Fort Defiance, AZ

Specialty Grading for Professional Baseball Fields
Results
$60,000 est. value
Scottsdale, AZ

Merkin Vineyards Grading and Site Utilities Phase I
New Construction
Construction
Cottonwood, AZ

Site Development for Campus Security Parking Lot Project
Infrastructure
Post-Bid
Tsaile, AZ

Reported 03/15/2022 12:00 AM
Project Title

Drilling Services at Naco, AZ

Physical Address View project details and contacts
City, State (County) Naco, AZ   (Cochise County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform ten (10) CPTs to a depth of one-hundred (100’) feet at specific locations as indicated by USBP/CBP representative. The contractor shall deploy magnetometer based sensors, electrical resistivity sensors or a probe based camera at the direction of USBP/CBP representative to record data as a function of depth. All recorded data along with locations of each test to sub-centimeter accuracy GPS coordinates shall be delivered at completion of project. If the geology is not suited to CPT, another exploratory geophysical technique may be proposed such as traditional geotechnical borings with sampling/data logging

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents