Similar Projects
Seay Road Widening - CP30001720 - Spartanburg County
Infrastructure
Conception
$1,800,000 CJ est. value
Spartanburg, SC 29307

Seay Road Widening - CP30001720 - Spartanburg County
Infrastructure
Conception
$1,800,000 CJ est. value
Spartanburg, SC 29307

Belcher Road Intersection Improvement - CP30000220 - Spartanburg County
Infrastructure
Design
$900,000 CJ est. value
Boiling Springs, SC 29316

Belcher Road Intersection Improvement - CP30000220 - Spartanburg County
Infrastructure
Design
$900,000 CJ est. value
Boiling Springs, SC 29316

South Church Street Gateway Enhancements
Infrastructure
Bidding
$228,000 CJ est. value
Spartanburg, SC 29306

South Church Street Gateway Enhancements
Infrastructure
Bidding
$228,000 CJ est. value
Spartanburg, SC 29306

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Country Club Road Utilities Relocation Project
Infrastructure
Post-Bid
$1,250,000 CJ est. value
Spartanburg, SC 29302

Sealcoat and Re-Striping Services
Infrastructure
Results
Boiling Springs, Chesnee, SC 29316

District Two Paving Project
Infrastructure
Results
$470,000 est. value
Chesnee, SC

Biscuitville / Duncan
New Construction, Infrastructure - 2,734 SF
Construction
$600,000 CJ est. value
Duncan, SC 29334

Clifton Mill No. Two / Clifton Mill Residences
Demolition, New Construction, Infrastructure - 252,349 SF
Pending Verification
$60,000,000 CJ est. value
Spartanburg, SC 29307

Southport Lux Apartments
New Construction, Infrastructure - 77,632 SF
Pending Verification
$21,200,000 CJ est. value
Spartanburg, SC 29306

Davis Road Reclamation Widening - Spartanburg County
Infrastructure
Conception
$1,300,000 CJ est. value
Spartanburg, SC 29303

Belcher Road Widening - CP30000320 - Spartanburg County
Infrastructure
Design
$3,050,000 CJ est. value
Boiling Springs, SC 29316

Last Updated 12/19/2023 11:08 AM
Project Title

Hanging Rock Road Widening - CP30003122 - County of Spartanburg

Physical Address View project details and contacts
City, State (County) Boiling Springs, SC 29316   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide funding for widening of Hanging Rock Road. Hanging Rock Road is approximately 1.6 miles in length and connects Valley Falls Road to Double Branch Road. The road is approximately 18 feet wide and is currently in fair to poor condition. This project includes a complete reconstruction which involves widening the road to 24 feet, improving horizontal curve and vertical hill issues, and installing any needed safety improvements (to include, but not limited to rumble strips, raised/reflective pavement markers, signage, guardrails, and pavement markings.) Included with this project is associated engineering design and right-of-way acquisition. Future funding for this project will be from General obligation bond proceeds. This project directly supports Council's strategic vision by being a core component of the County's infrastructure plan. The project also improves services provided to citizens by upgrading a roadway in a highly traveled corridor of the County. As of December 19, 2023, this project is included in the Spartanburg County 2024-2028 Capital Improvement Program (CIP). This is an ongoing project. Engineering and design services, along with the associated right-of-way acquisition, are currently in process and are expected to continue throughout FY 2022/23. Additional funding is planned for FY 2023/24. Design team has not been identified per owner. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents