Similar Projects
Bayshore & Lakehurst Signalization - City of Port St. Lucie
Infrastructure
Conception
$800,000 CJ est. value
Port Saint Lucie, FL 34983

Glenwood Rehabilitation - City of Port Saint Lucie
Infrastructure
Conception
$500,000 CJ est. value
Port Saint Lucie, FL 34984

Greco Lane Multi-Residential Development / Port St Lucie
New Construction, Infrastructure - 64,063 SF
Design
$13,400,000 CJ est. value
Port St Lucie, FL 34953

Bluekey / City of Port Saint Lucie
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Port St Lucie, FL 34953

RFQ Contractor - Indian River Lagoon South (IRL-S) C-23/C-24 North Reservoir S-425/S-426 Contract 4A
Infrastructure
Bidding
$500,000,000 CJ est. value
Port St Lucie, FL 34953

RFQ Contractor - Indian River Lagoon South (IRL-S) C-23/C-24 North Reservoir S-425/S-426 Contract 4A
Infrastructure
Bidding
$500,000,000 CJ est. value
Port St Lucie, FL 34953

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design Criteria Package for the Police Training Facility - City of St. Lucie
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Port St Lucie, FL 34953

Vero Beach Portable Water System Interconnect Project
Infrastructure
Results
FL

Glades to Tradition Reuse Water Main Construction Project
Infrastructure
Results
$5,000,000 est. value
Port Saint Lucie, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Wylder Communities / Port Saint Lucie - Master Plan
New Construction, Infrastructure
Construction
$200,000,000 CJ est. value
Fort Pierce, FL 34981

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Wawa - SE Becker Road / Port St. Lucie
New Construction, Infrastructure - 4,736 SF
Pending Verification
$1,600,000 CJ est. value
Port St Lucie, FL 34953

NW East Torino Turn Lane Improvements - City of Port Saint Lucie
Infrastructure
Conception
$1,000,000 CJ est. value
Port Saint Lucie, FL 34986

Last Updated 07/07/2023 03:02 PM
Project Title

McCarty Ranch Extension Water Quality Restoration Project - Areas 5 and 6

Physical Address View project details and contacts
City, State (County) Port St Lucie, FL 34953   (Saint Lucie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,674,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of the City is to procure the services of one (1) qualified Contractor related to the construction of the McCarty Ranch Extension Water Quality Restoration Project. This work will be consistent with the adopted goals, objectives, and programs of the City of Port St. Lucie City Council. All work shall be in accordance with the project plans prepared by CAPTEC Engineering, Inc., consisting of pages 1 - 11. The contract period is estimated at two hundred seventy (270) calendar days with no option to renew. It is the intent of the City to enter into a unit price contract with one (1) qualified Contractor to provide all of the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, and other incidentals required to complete the construction of an 86.58-acre water farm and a 39.87-acre water farm at the McCarty Ranch Extension. It is the general intent that the Contractor shall excavate all quantities for the construction of proposed seepage canals and perimeter berm. Areas will be cleared for excavation and placement of material to be used for the construction of two (2) seven-foot-tall above ground impoundment (AGI) that will retain water via gravity from the completed AGIs. Additionally, the Contractor shall be required to construct three (3) emergency overflow connections, consisting of FDOT Type "H" Ditch Bottom Inlets with 36" and 48" Corrugated Aluminum Pipe (CAP). The Contractor shall be responsible for the construction of the 36" and 48" gravity inflow pipes from the existing AGIs into the proposed AGIs. The Contractor shall dewater the excavations to provide a dry condition during excavation and account for site drainage management during the dewatering operation. The Contractor shall provide all materials, supplies, labor and equipment necessary for a complete project based on all specifications and amendments that may be deemed necessary. The Contractor must have all the required licenses and certifications necessary to perform this work. The approved license for this project is a State of Florida General Contractor license. It is the Contractor's responsibility to verify with the City's Building Department that they possess the proper licenses and certifications to perform the work prior to submitting a bid. There will be grant reporting requirements, such as certified weekly payroll reports from the prime Contractor and all subcontractors including the number of jobs created and the number of jobs retained by the project for both the Contractor and all subcontractors, which the successful Bidder will have to satisfy. The exact nature and extent of the reporting requirements are unknown at this time. When the reporting requirements are known, the Contractor will be required to provide the information as directed. See attachments for more information. The "Florida Fair Share" goals set forth by the Grant Agreement for Disadvantage Business Enterprises (DBE) and for Women's Business Enterprise (WBE) is combined at 10%. The Contractor agrees to include in their bid documents for subcontractors the negotiated "Florida Fair Share" percentages. The City reserves the right to extend the bid opening date when no responses or only one (1) response is received. Receipt of a bid in any other form does not satisfy this requirement. No hard copies will be accepted. NOTE: The City may not accept proposals from firms that have had adversarial relationships with the City or firms that have represented entities that have had adversarial relationships with the City. This includes the firm, its employees and their financial or legal interests. Deadline for written questions sent via email is October 30, 2022 5:00 p.m. Scope of Work: All work shall be in accordance with the project plans prepared by CAPTEC Engineering , Inc., consisting of pages 1 - 11 . The Contractor shall provide all of the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, and other incidentals required to complete the construction of an 86.58- acre water farm and a 39.87-acre water farm at the McCarty Ranch Extension. It is the general intent that the Contractor shall excavate all quantities for the construction of proposed seepage canals and perimeter berm. Areas will be cleared for excavation and placement of material to be used for the construction of two (2) seven-foot-tall above ground impoundment (AGI) that will retain water via gravity from the completed AGIs. Additionally, the Contractor shall be required to construct three (3) emergency overflow connections, consisting of FDOT Type "H" Ditch Bottom Inlets with 36" and 48" Corrugated Aluminum Pipe (CAP). The Contractor shall be responsible for the construction of the 36" and 48" gravity inflow pipes from the existing AGIs into the proposed AGIs. The Contractor shall dewater the excavations to provide a dry condition during excavation and account for site drainage management during the dewatering operation. The Contractor shall provide all materials, supplies, labor and equipment necessary for a complete project based on all specifications and amendments that may be deemed necessary. Question Deadline 10/30/2022 at 5:00 PM ET project no 220202-32921 JOB No. : 1682.2

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents