Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

1413 West 13th St Rehab Project
Infrastructure
Bidding
$250,000 est. value
Davenport, IA 52804

Sewer Lateral Program FY23
Infrastructure
Bidding
$50,000 to $600,000 est. value
Davenport, IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

PCC Pavement - Replace
Infrastructure
Bidding
$3,000,000 to $3,500,000 est. value
Davenport, IA

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

West 69th Street and Jebens Avenue Road Projects
Infrastructure
Bidding
$200,000 est. value
Davenport, IA 52806

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

Last Updated 05/30/2022 04:49 AM
Project Title

F33 - HMA Resurfacing/Cold in-Place Recycling

Physical Address View project details and contacts
City, State (County) IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fm-c082(66)--55-82 Route: f33 On f33, From z30 e 4.1 Miles To Hwy 67 876.00 Ton Asphalt Binder 571.00 Cubic Yard Excavation Class 10 2,955.00 Ton Granular Shoulders, Type b 55,464.00 Square Yard Hma, In Place (Recycled) 14,595.00 Ton Hot Mix Asphalt 367.84 Cubic Yard Modified Subbase 624.97 Station Pavement Markings 2,012.00 Square Yard Pavement Scarification 1,878.00 Square Yard Removal Of Pvmnt/Drives/Sdwk Fm-c082(67)--55-82 Route: z30 On z30, From Valley Dr n 2.8 Miles To 205th St 700.00 Ton Asphalt Binder 404.00 Gallon Asphalt Emulsion, Fog Seal 2,018.00 Ton Granular Shoulders, Type b 35,900.00 Square Yard Hma, In Place (Recycled) 11,660.00 Ton Hot Mix Asphalt 3.08 Square Yard Median, p.c.c. 645.60 Station Pavement Markings 5,292.06 Square Yard Pavement Scarification

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents