Similar Projects
Potawatomi Tower Revitalization
Infrastructure
Conception
$1,000,000 CJ est. value
Sturgeon Bay, WI 54235

2022 Parking Lot Improvements - Sister Bay Campus
Infrastructure
Post-Bid
$120,000 est. value
Sister Bay, WI 54234

Asphalt Replacement Program
Infrastructure
Post-Bid
Sturgeon Bay, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Alley Reconstruction
Results
$664,705 est. value
Whitefish Bay, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

South Duluth Avenue Apartments
New Construction, Infrastructure - 77,680 SF
Pending Verification
$22,000,000 CJ est. value
Sturgeon Bay, WI 54235

Egg Harbor Road Rental Townhomes / Cherry Tree Terrace & Apple Tree Terrace
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Sturgeon Bay, WI 54235

2022 Sidewalk Improvement Program
Infrastructure
Post-Bid
Whitefish Bay, WI

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

Construct Boat Access Parking Area Rowleys Bay
Infrastructure
Construction
$178,000 CJ est. value
Ellison Bay, WI 54210

YMCAs Sturgeon Bay Addition
Addition, Demolition, Infrastructure - 16,300 SF
Pending Verification
$4,200,000 CJ est. value
Sturgeon Bay, WI 54235

Pulverize and Pave with Hot Mix Asphalt
Infrastructure
Post-Bid
WI

STH 42, City of Sturgeon Bay, S. Junction STH 57 - Bayview Bridge
New Construction, Infrastructure
Results
WI

Last Updated 02/13/2023 12:08 AM
Project Title

Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail

Physical Address View project details and contacts
City, State (County) Egg Harbor, WI 54209   (Door County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Walk, Bike and Eggsplore Egg Harbor V Egg Harbor Const / Misc Ped / Bike Trail Tap < 5,000 Estimate Anticipated Funding $2,000,000 - $2,999,999 As of February 13, 2023, the project is in Final Planning status. Anticipated letting date is May 25, 2023. WisDOT - Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents