Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

Cherrywood Park Drainage Improvements
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Thornton, CO 80602

Cherrywood Park Drainage Improvements
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Thornton, CO 80602

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

District-Wide Maintenance
Infrastructure
Post-Bid
Aurora, CO

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Riverdale Ridge High School CTE/STEM Center
New Construction, Infrastructure - 47,500 SF
Construction
$22,500,000 CJ est. value
Thornton, CO 80602

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

Fairfax Park Drainage Outlet Reconstruction - City of Commerce City
Infrastructure
Conception
$4,950,000 CJ est. value
Commerce City, CO 80022

Last Updated 05/08/2023 04:12 PM
Project Title

2023 Asphalt Mill and Overlay

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000317649 2023 Asphalt Mill and Overlay Project at locations throughout the City of Commerce City, Colorado The Work to be performed under this contract includes removal of pavement markings, asphalt repair, mill and overlay of designated streets, installation of pavement striping and markings, installation of speed humps, repaving of parking lots, and related work, at locations to be provided by the Commerce City Public Works Department (see Attachment G). The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with the Contract Documents. The Contractor will be required to coordinate construction activities with the City and any other entities necessary for completion of the Project, including but not limited to Republic Services, school districts, special districts, HOAs, and Metro Districts, as applicable. Location of the Work The location of the work to be completed under this contract includes: o Local streets in the Central area including E. 63rd Place from Holly Street to Ivy Street, E. 63rd Place from Kearney Street to Monaco Street, E. 63rd Avenue west to the end of the cul-de-sac, and E. 62nd Place west to the end of the cul-de-sac o Olive Street from E. 64th Avenue to E. 67th Avenue o Weiman Court from Glencoe Drive slightly east to E. 72nd Avenue o Forest Street from E. 69th Avenue to E. 70th Avenue o E. 71st Avenue from Grape to Holly Street General Requirements - Contractors License Required - Insurance Required - Warranty Information Required Contact Information Pete Adler 303-349-3394 padler@c3gov.com Michael McGoldrick 303-286-4846 mmcgoldrick@c3gov.com Question Deadline 04/28/2023 at 4:00 PM MT Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents