Similar Projects
Last Updated | 11/11/2020 10:07 AM |
Project Title | Zuni Wastewater Treatment Improvements |
Physical Address | View project details and contacts |
City, State (County) | Zuni, NM 87327 (McKinley County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Buy Indian Set-Aside (specific to Department of Health and Human Services, Indian Health Services): Scope of Work The following is a Draft Scope and may change prior to solicitation release. The Contractor shall furnish all labor, materials and equipment for the construction of an improved wastewater lagoon treatment facility. Through a two-phase construction approach, the existing 32.6-acre, six cell lagoon facility will be renovated and expanded to a 49-acre, five (5) cell treatment system. In general, work to be performed under this contract includes, but is not limited to: Phase 1 will expand one of the existing cells by 16.8 acres to construct a new 21.6 acre primary treatment cell (Cell 1). Construction of the new treatment Cell 1 shall include all necessary earthwork and the installation of all prescribed piping structures and other prescribed appurtenances, including but not limited to: Installation of a 16-foot deep inflow-receiving fermentation pit featuring a new inlet piping structure. Installation of one (1) new transferring piping structure to accomplish the intended treatment train. Installation of new discharge piping. Installation of approximately 480 linear feet of 18-inch PVC gravity sewer pipe to convey discharge flows from the new Cell 1 to the existing gravity sewer pipe and lift station. Installation of approximately 480 linear feet of new 18-inch PVC gravity sewer pipe. The new pipe shall extend from the outlet of new Cell No. 1 and connect to the existing 18-inch PVC gravity sewer pipe at the location indicated in the Construction Drawings. Installation of HDPE liner with air / gas vents and anchor trenching throughout the new primary treatment chamber. Construction and surface preparation of the top-of-berm access roads. The other five (5) existing cells shall be kept in operation while the phase 1 improvements are under construction. 2 . Phase 2 will reconfigure and rehabilitate the other existing treatment cells to construct new treatment Cells 2, 3, 4, and 5. Reconfiguration and rehabilitation efforts shall include all necessary earthwork and the installation of all prescribed piping structures and other appurtenances, including but not limited to the: Installation of five (5) new transferring piping structures to accomplish the intended treatment train. Installation of a new inlet piping structure. Installation of a new discharge structure and piping. Installation of the HDPE liner with air/gas vents and anchor trenching through the prepared cells. Construction and surface preparation of the top-of-berm access roads. Extracted bio solids are to be adequately mixed with the excess natural (clean), excavated material. The mixed material shall be stockpiled at the designated spoil location. Installation of approximately 3,360 square yards of rip-rap with geotextile underlayment on the eastern and southern exterior embankments. Installation of approximately 7,060 linear feet of 6-foot high chain link fencing around the newly constructed lagoon facility. Perimeter fencing shall include (2) 14-foot wide, double-door access gates. Installation of a new dual-channel ultrasonic wastewater flow meter in the existing valve pit at the Lagoon Lift Station. The existing electromagnetic (in-line) flow meter shall be removed from the meter vault and replaced with new force main piping. This notice is issued solely for information and planning purposes and does not constitute a Request for Proposal (RFP) or a commitment on the part of the government to conduct a solicitation for the stated services in the future. Responders are advised that the government will not pay for information submitted in response to this RFI, nor will it compensate responders for any costs incurred in the development/furnishing of a response. Please note that a decision not to submit a response to this RFI will not preclude a vendor from participating in any future solicitation. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |