Similar Projects
Repair B104 Sanitary Sewer
Infrastructure
Design
$250,000 CJ est. value
Danville, IL 61832

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construct Fitness Trail
Infrastructure
Bidding
$1,000,000 CJ est. value
Danville, IL 61832

Seal Coat Treatment
Infrastructure
Post-Bid
Rossville, IL

Seal Coat, Sidewalk Removal and Replacement, Concrete Curb and Gutter Removal and Replacement, Pavement Removal and Pavement Patching
Infrastructure
Post-Bid
Hoopeston, IL

Crack Sealing
Results
Danville, IL

Seal Coat
Results
Danville, IL

2022 Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Danville, IL 61834

Concrete Work and Trench Repair
Infrastructure, Alteration
Post-Bid
Danville, IL

Seal Coat Program
Infrastructure
Results
Less than $58,885 est. value
Potomac, IL

Addition and Remodeling Armstrong-Ellis Grade School
Addition, Demolition, Build-out, Infrastructure - 2,870 SF
Bidding
$750,000 CJ est. value
Armstrong, IL 61812

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Street Improvements
Infrastructure
Results
Westville, IL

2022 Concrete Pavement Patching
Infrastructure
Post-Bid
$200,000 est. value
Danville, IL

Park Street Pump Station Improvements
New Construction
Results
$539,000 est. value
Rossville, IL

Last Updated 12/02/2022 10:11 AM
Project Title

Lakeside Drive, Eastgate Drive, and Woodland Trace Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Danville, IL 61832   (Vermilion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $980,386 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Lakeside, Eastgate, and Woodland Trace Pump Station Improvements. Est. Completion Date: Oct. 31, 2023. Sanitary Sewer (Gravity), Electrical Installation/Construction, Sewer Pump Station, Sewer Force Main, Electrical and Controls, Sewer and Water Construction, Pumps or Pump stations The project consists of supplying the labor, equipment, and material necessary to furnish and install two (2) wet well submersible and one (1) underground replacement sewage pumps and accessories. There are three (3) pump stations: Lakeside Drive, Eastgate Drive, & Woodland Trace Condominium locations. The project also includes demolition and removal of certain structures, bypass pumping, electrical work, controls, site work, pavement, erosion control, cleanup, fencing, seeding and other items of construction.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents