Similar Projects
Last Updated | 10/13/2021 11:53 AM |
Project Title | Horsethief Basin Roads Maintenance - Prescott National Forest |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: AZ |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This will consist of shaping road surface to maintain proper surface drainage. Berms along the edge of the road should be removed if they will trap water on the road. Eliminate surface protruding rocks. Contractor to installing proper drain features to control surface water drainage. This will include; cleaning bar ditches, cleaning culverts, installing new rolling dips and lead-outs and there may be areas requiring new culverts to be added. Contractor to note how many are required for each phase. All phases will require brush clearing. Contractor and COR will determine and mark best locations for installing new bar ditches, lead-outs, rolling dips and culverts requiring cleaning. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |