Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Pavement Condition Electronic Surveying
Infrastructure
Bidding
Peoria, AZ

Sunland Gin Road Project
Infrastructure
Bidding
$4,500,000 to $5,000,000 est. value
Florence, AZ 85132

Concrete Slope Paving at 2 Locations
Post-Bid
Window Rock, AZ 86515

AZ FTNP CAGR 10(2), Entrance Road
Post-Bid
$750,000 to $1,000,000 est. value
Coolidge, AZ 85128

Streets Maintenance Repaving, Surface/Slurry Seals & General Repair Services
Results
Chandler, AZ

Construction Manager at Risk for Aquatics Center and Northern Avenue Reconstruction
Results
Coolidge, AZ 85128

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

Kayenta Shopping Center - Asphalt Seal Coating
Renovation - 113,174 SF
Construction
Kayenta, AZ 86033

Santa Rosa Pavement Reconstruction Project
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Casa Grande, AZ

Job Order Master Agreement
Post-Bid
Nogales, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $3,000,000 est. value
AZ

Forest Road Connection Project
Infrastructure
Bidding
Sedona, AZ 86351

FY 2021 Cave Creek Road Microsurfacing
Post-Bid
Cave Creek, AZ

Last Updated 10/13/2021 11:53 AM
Project Title

Horsethief Basin Roads Maintenance - Prescott National Forest

Physical Address View project details and contacts
City, State (County) State-Wide: AZ
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This will consist of shaping road surface to maintain proper surface drainage. Berms along the edge of the road should be removed if they will trap water on the road. Eliminate surface protruding rocks. Contractor to installing proper drain features to control surface water drainage. This will include; cleaning bar ditches, cleaning culverts, installing new rolling dips and lead-outs and there may be areas requiring new culverts to be added. Contractor to note how many are required for each phase. All phases will require brush clearing. Contractor and COR will determine and mark best locations for installing new bar ditches, lead-outs, rolling dips and culverts requiring cleaning.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents