Similar Projects
Intersection Improvements and Related Work (Including Signals) Hathaway Road at Mount Pleasant and Nauset Streets
Bidding
Less than $2,752,959 est. value
New Bedford, MA 02740

Road Materials - Crack Sealing
Bidding
Berkley, MA

Furnishing Asphalt Paving
Term Contract
Post-Bid
Dighton, MA

Robert Treat Paine Drive Improvement Project
Post-Bid
$1,960,000 est. value
Taunton, MA

2018 Town Roadway Paving Improvements
Results
$500,000 est. value
Westport, MA

Intersection Improvements and Related Work at Washington (Route 138) and Union Streets
Results
Less than $1,963,339 est. value
Easton, MA

Road Materials - Full Depth Reclamation
Bidding
Berkley, MA

On-Call Pavement Repair Services
Term Contract
Post-Bid
Less than $100,000 est. value
Taunton, MA 02780

Resurfacing, Pavement Repairs and Related Work at Various Locations
Results
Less than $1,778,300 est. value

Resurfacing and Related Work on Sections of Route 44 (Winthrop Street)
Bidding
Less than $4,733,328 est. value
Dighton, Taunton, MA 02718

Type 1 Pavement Resurfacing
Term Contract
Post-Bid
$1,200,000 est. value
Taunton, MA 02780

Scheduled and Emergency Roadway Repairs at Various Locations
Results
Less than $236,825 est. value

Statewide Airport Pavement Maintenance and Pavement Project at Various Airports
Post-Bid
Less than $1,000,000 est. value

Scheduled and Emergency Impact Attenuator Repairs at Various Locations
Results
Less than $635,000 est. value

Adjust/Reset Existing Structures
Post-Bid
Less than $88,000 est. value
Dartmouth, MA

Last Updated 01/10/2019 05:25 AM
Project Title

Intersection Improvements Project - Route 140/Norton Avenue, Taunton

Physical Address View project details and contacts
City, State (County) Taunton, MA   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $630,000
Plans Available from State Agency - 08/15/18
Owner View project details and contacts
Architect View project details and contacts
Description Includes roadway and traffic signal improvements at the intersection of Route 140 (Short Street) and Norton Avenue. Work includes micromilling and pavement resurfacing, minor horizontal realignment, installation of a new traffic signal system, new pavement markings, new signs, installation of new guardrail and other incidental work.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage, Traffic Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents