Similar Projects
$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Fourth Avenue Mixed-use Building
Demolition, New Construction, Infrastructure - 6,312 SF
Design
$2,000,000 CJ est. value
Brooklyn, NY 11217

RFP D/B - Replacement of the Coney Island Abutment Wall and Saint Marks Bridge
Demolition, New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
New York, NY 11216

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Job Order Contracting Regions 1, 3, 4, 8 and 9
New Construction
Post-Bid

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

Fulton Street Mixed Use
New Construction, Infrastructure - 130,000 SF
Construction
$50,000,000 CJ est. value
New York, NY 11238

Repairs and Painting on the Gowanus Viaduct in Brooklyn
Infrastructure
Construction
$167,358,000 CJ est. value
New York, NY 11220

Rutland Road Mixed Use
Demolition, New Construction, Infrastructure - 338,611 SF
Pending Verification
$103,000,000 CJ est. value
New York, NY 11203

Pennsylvania Avenue Affordable Housing Building / Brooklyn
New Construction, Infrastructure - 16,891 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY 11207

Bay Parkway Residential Development
Demolition, New Construction, Infrastructure - 47,525 SF
Design
$10,000,000 CJ est. value
Brooklyn, NY 11214

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Job Order Contracting - Regions 2B, 3A, 3B, 4A, 4B, 5 and 6
Results
$2,000,000 to $10,000,000 est. value

Columbia Street Mixed-Use Building
Demolition, New Construction, Infrastructure - 10,848 SF
Construction
$3,000,000 CJ est. value
Brooklyn, NY 11231

Last Updated 10/13/2022 06:37 AM
Project Title

RFP D/B - Design and Construction of a Railcar Acceptance and Testing Facility

Physical Address View project details and contacts
City, State (County) Brooklyn, NY 11220   (Kings County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Request for Qualifications, Construction start expected July 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Metropolitan Transportation Authority ("MTA"), by and through the MTA Construction and Development Company ("MTA C&D"), will be issuing a two-step Request for Proposals ("RFP"), in order to identify and engage a qualified Design-Builder to develop, design, and construct a new Railcar Acceptance and Testing Facility located on the South Brooklyn Railway property at 3rd Avenue between 38th and 39th Streets and 38th Street Yard in the Borough of Brooklyn. The new facility shall be designed and constructed to give the utmost importance to operational efficiency and in compliance with all applicable NYCT, City, State and Federal codes, regulations and standards and has features, systems and equipment needed to meet the maintenance requirements of the current, and future railcar fleet. The Design-Build Contract will be awarded as a fixed lump sum price contract to the proposer that submits the proposal that MTA C&D determines, in its sole discretion, to offer the best value based on an evaluation of qualitative factors, as well as cost and schedule, following the two-step solicitation process. This method of procurement is intended to encourage development of innovative designs, planning and logistics while also optimizing schedule and the sharing of risks related to the work. Contract Term: 26 months Funding: 100% MTA Estimated $ Range: Over $50M Goals: MBE 15%, WBE 15%, SDVOB 6%

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents