Similar Projects
Design-Build Edinburg Pump Station Levee Rehabilitation
Design
$1,000,000 to $5,000,000 est. value
Hidalgo, TX

Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Sandy Lake Lift Station Improvements
New Construction
Bidding
$5,946,408 est. value
Coppell, TX

Davis Road Lift Station No. 1 and No. 2 Rehabilitation
Post-Bid
Less than $630,000 est. value
League City, TX 77573

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Lift Station 1 (ML-1) Flow Meter Improvements Project
Results
The Colony, TX 75056

Village Creek Water Reclamation Facility South Flow Lift Station
New Construction
Construction
$19,993,000 est. value
Fort Worth, TX

Bird Creek Basin Wastewater Projects
New Construction
Pending Verification
$5,400,000 est. value
Temple, TX

Water System Improvements - Proposed Pump Station Number 5
New Construction
Bidding
$250,000 est. value
Gordon, TX

Lift Station Control Panel Replacement Project
Post-Bid
Sugar Land, TX 77487

Improvements to Vista Ridge Lift Station
Results
$4,831,155 est. value
Lewisville, TX 75057

Summerwood Trails Lift Station
New Construction, Demolition
Bidding
TX

Lift Station 12 Rehabilitation
Post-Bid
$450,000 to $500,000 est. value
Texas City, TX 77590

Lake Arlington Raw Water Pump Station Shared Operations Improvements
Results
$17,200,000 est. value
Arlington, TX 76013

Last Updated 09/20/2021 11:11 AM
Project Title

Phosphate Feeding Facilities at Five Booster Station Sites

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,961,580 to $3,372,911
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of poly/orthophosphate chemical feeding facilities at five EP Water booster station sites: Airport, McRae, Montana, Nevins, and Northeast. The scope includes furnishing and installing chemical storage tanks with concrete containment and shade structure, chemical feed injection system for injection to existing large diameter water transmission mains, double containment chemical lines, prefabricated fiberglass buildings, flow meters with vault, large diameter ductile iron water pipe at the flow meters, butterfly valves with manhole, associated electrical work, SCADA control, concrete header curbs, and HMAC driveway.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities, Common Work Results for Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents