Similar Projects
Sitework, HVAC & Classroom Improvements
Post-Bid
Burr Ridge, Willowbrook, IL 60527

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

Addison Campus Parking Lot Improvements
Results
Addison, IL 60101

RR-20-4552 - Structural Rehabilitation
Results
IL

2021 MFT Road Program
Post-Bid
Burr Ridge, IL

Water Main Replacement
Results
Less than $1,700,000 est. value
Glendale Heights, IL 60139

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Earthwork
Post-Bid
Glendale Heights, IL 60139

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

RR-20-4544 - M-8 Maintenance Facility Westbound Access Road
Renovation
Results
Oak Brook, IL 60521

2021 Crack Sealing Bituminous Pavement
Post-Bid
Bloomingdale, IL

2021 Street and Pavement Patching Programs
Results
Roselle, IL

Pavement Resurfacing
Post-Bid
Naperville, IL

Last Updated 07/28/2022 04:10 PM
Project Title

2022 Storm Sewer Improvements Project

Physical Address View project details and contacts
City, State (County) Roselle, IL 60172   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $93,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Roselle is accepting sealed proposals for the 2022 Storm Sewer Improvements Project located at various locations throughout the Village of Roselle. The proposed improvements contain approximately 345 feet of new 8", 10" and 12" PVC storm sewers; 50 cubic yards of trench backfill; 150 feet of 4" underdrain; 1 new type A inlet; 4 new type C catch basins; new frame and grates; 80 feet of combination concrete curb & gutter removal and replacement; 1000 feet of regrading and shaping of ditches; 850 square feet of sidewalk removal and replacement; 146 square yards of hot-mix asphalt pavement removal and replacement; traffic control and protection; parkway restoration and other necessary incidental works. Tabulated bid results will be posted on the Village's website after the bid opening. Proposals must be placed in a sealed envelope marked "Proposal for the 2022 Storm Sewer Improvements Project.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents