Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

McKee Hill Road Resurfacing
Post-Bid
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - US 40-00.00
Results
OH

Four Lane Resurfacing - LIC-IR 70-19.47
Results
OH

Road Maintenance
Post-Bid
Croton, OH

Harrison Township Resurfacing Project
Results
$422,509 est. value
OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Street Improvements
Results
$150,000 est. value
Gratiot, OH

2021 Asphalt Paving of Roads
Infrastructure
Post-Bid
Newark, OH

Oregon Street Reconstruction Phase III
Results
$657,277 est. value
Hartford, OH 43013

Edwards Road Street Resurfacing
Infrastructure
Post-Bid
Johnstown, OH 43031

2021 Miscellaneous Roadway Improvements
Results
$520,000 est. value
Granville, OH

North Oregon Area Roadway and Stormwater Improvements
Infrastructure
Post-Bid
Johnstown, OH 43031

Last Updated 07/21/2022 08:49 AM
Project Title

Green Chapel Road from 62 to Clover Valley Road - Ohio Department of Transportation

Physical Address View project details and contacts
City, State (County) Johnstown, OH 43031   (Licking County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024,
Bids Due View project details and contacts
Estimated Value $19,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Johnstown, Ohio. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. A detailed scope has not been identified. As of July 20, 2022, the Mid-Ohio Regional Planning Commission is expanding the scope of transportation improvements planned out to 2050 in light of Intel Corp.'s $20 billion investment in the region. Further details regarding design timelines have not been identified. Construction is slated to begin in 2024; however, the firm date has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents