Similar Projects
Y--Zion-New Water System at Kolob Canyons
Design
$1,000,000 to $5,000,000 est. value
Denver, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Bidding
$10,000,000 est. value
Estes Park, CO 80517

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Bidding
$10,000,000 est. value
Estes Park, CO 80517

65,000-Gallon Water Tank Painting
Post-Bid
Colorado Springs, CO

DOVE Compliance Improvements
Post-Bid
Victor, CO

SCWTP Backwash Tank Improvements
Results
Less than $200,000 est. value
Louisville, CO 80027

29Th Street 5.5 Mg D115 Water Storage Tank
Results
Loveland, CO 80537

North Tanks Recoating and Relining Project
Infrastructure
Bidding
CO

West Concrete Water Storage Tank
Post-Bid
Less than $2,250,000 est. value
Falcon, CO

J--MEVE (CM) Replace GAC Water Plant
Results
Lakewood, CO

J099-- Underground Storage Tank Repair Services -554
Post-Bid
Aurora, CO 80045

Upper Water Storage Tank Rehabilitation Project
Results
Del Norte, CO

Middle Water Storage Tank Foundation Stabilization
Post-Bid
Less than $200,000 est. value
Clifton, CO 81520

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

Moraine Park Campground and HQ Utilities
Post-Bid
Grand Lake, CO

Last Updated 07/13/2021 11:31 AM
Project Title

Rehabilitation of Two 2-MG Drinking Water Storage Tanks

Physical Address View project details and contacts
City, State (County) Cortez, CO   (Montezuma County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitation of two 2-MG above-ground welded steel drinking water storage tanks, including spot steel shell and structural supports repairs and replacement, clip replacements, floor plate spot replacements, sand blasting, painting the interior and exterior, and other appurtenant work on Tanks 1 and 2.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents