Similar Projects
New Jail Construction
New Construction
Conception
$32,000,000 est. value
Ironton, OH

Regional Jail Expansion
Addition
Conception
OH

Mansfield & Richland Correctional Institution Renovations
Renovation
Design
$11,430,000 est. value
Mansfield, OH

Harrison County Jail
New Construction
Design
$15,000,000 est. value
Cadiz, OH

RFQ Construction Manager at Risk - CHJCF Building Replacement Phase 1
Renovation
Bidding
$150,000,000 CJ est. value
Highland Hills, OH 44122

Ohio Reformatory for Women Improvements Project Package 1 - Kennedy Stair Replacement
Renovation
Bidding
$190,000 CJ est. value
Marysville, OH 43040

RFQ Design - Cuyahoga County Corrections Center Project
Renovation
Post-Bid
$5,000,000 CJ est. value
Cleveland, OH 44113

Wood County Jail Expansion and Renovation for Detention Equipment and Secured Electronics
Renovation
Post-Bid
$19,806,750 est. value
Bowling Green, OH 43402

OPI Glove Manufacturing Facility
New Construction
Results
$3,000,000 est. value
London, OH 43140

Gallipolis Developmental Center (GDC) AT Building HVAC and Roof Replacement
Renovation
Results
$4,284,900 CJ est. value
Gallipolis, OH 45631

RFQ Design - Marion Correctional Institution (MCI) General Renovations
Renovation
Pending Verification
$7,300,000 CJ est. value
Marion, OH 43302

Scioto County Jail Expansion
Addition
Pending Verification
Portsmouth, OH 45662

New Jail
New Construction
Conception
$50,000,000 est. value
OH

RFP Construction Manager at Risk - Building Renovations and Expansion
Addition, Demolition, Renovation, Infrastructure - 131,000 SF
Post-Bid
$45,000,000 CJ est. value
Columbus, OH 43230

Jail Expansion/Renovation
Renovation
Results
$19,806,750 to $21,342,000 est. value
OH

Last Updated 11/28/2022 03:32 AM
Project Title

RFQ Construction Manager at Risk - Ross Correctional Institution (RCI) General Renovations

Physical Address View project details and contacts
City, State (County) Chillicothe, OH 45601   (Ross County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,975,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The selected Construction Manager at Risk ("CM"), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and/or Owner, the A/E and the CM. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority and/or Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price ("GMP") proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E's statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority's approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum ("GMP Amendment"). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM's selection of subcontractors and any supplemental terms to the form subcontract. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (MP, GC, CMR, DB) 2. Role on project (CMA, OA, CMR, DB, GC, Trade) 3. Correctional facility project experience 4. Renovation project experience 5. Systems and facility operations experience 6. Building code, ACA, EPA, etc. - interaction and application 7. Experience with secured/inmate occupied facility 8. Phased construction experience 9. Constructability, cost estimating, budget analysis with AE experience 10. Experience with ODRC, OFCC, OAKS CI Submit all questions regarding this RFQ in writing to OFCC at Procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents