Similar Projects
Last Updated | 07/25/2022 04:35 PM |
Project Title | SR-810/Hillsboro Blvd From SR-7/US-441 to SR-845 - Florida Department of Transportation |
Physical Address | View project details and contacts |
City, State (County) | Deerfield Beach, FL 33441 (Broward County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2024 |
Bids Due | View project details and contacts |
Estimated Value | $6,063,921 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 7, 2022, an engineer has been selected for the project. Bidding is estimated to take place in July of 2024 and construction is estimated to take place in Fall of 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Interview Professional Liability Insurance : $500,000.00 SR-810/Hillsboro Blvd From SR-7/US-441 to SR-845 TRC Members (Subject to Change) : Anson Sonnett Helen James Kris McKirdy SR-810/Hillsboro Boulevard from SR-7/US-441 to SR-845/Powerline Road. Mill and resurface the existing asphalt pavement from SR 7 /US-441 (MP 0.000) TO SR 845/Powerline Road (3.080). Reconstruct noncompliant curb ramps. Upgrade existing pedestrian curb ramps and install detectable warning surfaces. Repair damaged sidewalks. Lighting retrofit at the signalized intersections. Upgrade pedestrian signalization and push buttons at the signalized intersections. Existing Bridge #860036 has concrete deck. Minor drainage modifications resulting from upgraded pedestrian ramps. Financial Management Number(s) 447679-1-32-01 Longlist Date/Time 7/01/2021 10:30 am Shortlist Selection Date/Time 7/12/2021 9:15 am Technical Review Committee Meeting 1 Date/Time 7/28/2021 10:30 am Final Selection Date/Time 8/16/2021 9:15 am Negotiations Period Begin Date 8/21/2021 Negotiations Period Ending Date 10/30/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR-810/Hillsboro Blvd From SR-7/US-441 to SR-845 |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |