Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Hillsboro Airport Runway 13R-31L and Runway Safety Improvements
Infrastructure
Bidding
$10,235,000 CJ est. value
Hillsboro, OR 97124

Hillsboro Airport Runway 13R-31L and Runway Safety Improvements
Infrastructure
Bidding
$10,235,000 CJ est. value
Hillsboro, OR 97124

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Hall Boulevard / Pfaffle Street New Traffic Signal - City Of Tigard
Infrastructure
Conception
$950,000 CJ est. value
Tigard, OR 97223

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

Last Updated 12/19/2022 08:12 AM
Project Title

OR99W: I-5 - McDonald St Section Pacific Highway West

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $26,174,332 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Region : 1 PE EA : PE002905 CON EA : CON04581 OR99W: I-5 - McDonald St Section of the Pacific Highway West (Rt. No. OR99W) in Tigard. Estimated Value : ($ 20,000,000 - $ 30,000,000). Class of Work: Either A) Asphalt Concrete Paving and Oiling, or B) Miscellaneous Highway Appurtenances. The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. ORDOT - 003 - OR99W: I-5 - Mcdonald St Pacific Hwy West *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Grading, Drainage, Structures, Paving, Curb Ramps, Pavement Markings, Signing, Signals & Roadside Development OR99W: I-5 - McDonald St Section Pacific Highway West Washington & Multnomah Counties

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents