Similar Projects
HVAC Overhauls Located at Meadowlands Maintenance Complex
Alteration
Bidding
Newark, NJ

HVAC and Air Circulation System Install
Post-Bid
Newark, NJ 07102

RFP - Air Duct Cleaning Services
Renovation - 40,000 SF
Post-Bid
Newark, NJ 07102

J045--Bldg. 15-18 Hot Water System Replacement (VA-20-00003753)
Results
East Orange, NJ

Maplewood Municipal Building Roof and HVAC Replacement Project
Results
Maplewood, NJ 07040

43 Alexander Street - Capital Improvements 2021
Renovation
Construction
$131,000 est. value
Newark, NJ 07106

10 Washington Place 18 Washington Place Summer 2021 Capital Project
Renovation
Construction
$270,000 est. value
Newark, NJ 07102

N043--Correct Medical Air System Deficiencies
Post-Bid
Orange, NJ

HVAC Replacement at Auditorium DRG 2009 Ridgewood Avenue Elementary School
Results
$282,000 est. value
Glen Ridge, NJ 07028

Maintenance and Repair: HVAC Services
Post-Bid
Newark, NJ 07102

Provide Operations and Maintenance of Building Systems Heating, Ventilation, and Air Conditioning Systems at the Juvenile Detention Center
Term Contract
Results
Newark, NJ 07103

Source Capture Exhaust System for East Orange Fire Department
Post-Bid
East Orange, NJ 07018

Provide Operations and Maintenance of Building Systems Heating, Ventilation, and Air Conditioning Systems at the Essex County Hospital Center
Term Contract
Results
Cedar Grove, NJ 07009

HVAC System Zone B D Replacement Rehabilitation Project
Post-Bid
East Orange, NJ 07017

HVAC Upgrades (Phase A / B) and Masonry at Millburn Middle School
Results
Short Hills, NJ 07078

Last Updated 01/10/2022 03:29 PM
Project Title

HVAC Upgrades (Phase B) at Millburn Middle School

Physical Address View project details and contacts
City, State (County) Short Hills, NJ 07078   (Essex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, HVAC Upgrades to the 1930s / Auditorium / Cafeteria Wing, the Annex, and the Science Wing at Millburn Middle School. This package depicts Phase B (Phase 2) of a two-phase building wide project. Phase B shall include heating / air conditioning upgrades, upgrades to ventilation ductwork served by the ERU's replaced in Phase A. The heating / air conditioning upgrades shall involve the removal of existing unit ventilators, ground source heat pumps, and air handlers serving the Annex, 1930s/Cafeteria/Auditorium Wing, and Science Wing. These system(s) shall be replaced with new VRF units serving the 1930 Wing and Annex, a new RTU serving the 1930 Library, and new boiler plants, a new Air Handler / modified RTU's serving the Auditorium / Cafeteria; all of these systems shall be controlled through the existing Automated Building Management System.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents