Similar Projects
Lowering of SR 2058 (Hulton Road)
Bidding
PA

Riverview Avenue Subsidence
Post-Bid
Less than $30,000 est. value
Pittsburgh, PA 15219

2020 Paving Project
Post-Bid
Fairoaks, PA 15003

2019 Roadway Improvement Program
Results
Carnegie, PA 15106

2019 Roadway and Storm Sewer Improvements
Results
Pittsburgh, PA 15123

2020 Bituminous Paving Program
Post-Bid
Pittsburgh, PA 15239

2019 Road Improvement Project
Results
PA

Site 9 Mcclaren Road Development at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15219

Turnback Road Reconstruction Project
Results
Sewickley, PA 15143

2020 Pavement Maintenance Program
Post-Bid
Mount Oliver, PA 15210

Frazer Township 2019 Road Paving Project
Results
Tarentum, PA 15084

General Repaving, Hillside Repairs and Construct Dumpster Enclosures at Carson Middle School/Central Administration Offices - General
Post-Bid
Pittsburgh, PA 15237

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Axonburg Boulevard Milling and Resurfacing
Post-Bid
Oakmont, PA 15139

Citf Road Reconstruction
Results
Less than $100,000 est. value
North Braddock, PA 15104

Last Updated 04/24/2020 09:16 AM
Project Title

Bituminous Resurfacing

Physical Address View project details and contacts
City, State (County) PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provides for the furnishing of all labor, material, equipment and work necessary to perform the bituminous resurfacing of Allegheny Valley Interchange Ramps at MP 47.73. Also included is the construction of roadway drainage facilities, construction of guide rail, placement of erosion and sediment pollution controls, maintenance and protection of traffic during construction and pavement markings. Major work items include the following: 364 CY Excavation, Class 1 4,023 TON Asphalt Materials (Base, Binder & Wearing Courses) 55 TON Subbase No. 2A 142 SY Milling of Bituminous Pavement Surface, 2” Depth 12,171 SY Milling of Bituminous Pavement Surface, 4” Depth 2,049 SY Milling of Bituminous Pavement Surface to Concrete 281 LF Drainage Pipe, Various Types and Sizes 10 EACH Inlets, Various Types 6 EACH Inlet Top Units, Type M 4,749 LF Pavement Base Drain, Including Shoulder Restoration 1,073 SY Shoulder Backup 180 LF Rock Armor 824 CY Rock Armor, Modified 1,300 LF Guiderail, Various Types 170 LF Concrete Median Barrier, 34”

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents