Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Verdae Swamp Rabbit Trail (SRT) Underpass - City of Greenville
Infrastructure
Conception
Less than $2,000,000 est. value
Greenville, SC 29601

Spencer's Trail
New Construction
Design
Anderson, SC

SC Highway 9 East Widening
Alteration
Design
$20,200,000 est. value
Loris, SC 29569

Whittemore Elementary School Property
Infrastructure
Bidding
Conway, SC

Clearing and Grubbing Rawls Creek Park
Infrastructure
Bidding
$300,000 est. value
Irmo, SC 29063

Construction of 25,000SF Building Pad
Post-Bid
Less than $300,000 est. value
Beaufort, SC 29906

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

Site Improvements
Results
Lexington, SC

TOS Regional Stormwater Pond
Results
Summerville, SC 29483

Fox Rae Farms - Infrastructure
New Construction
Construction
Conway, SC 29526

Public Storage
New Construction, Demolition - 44,919 SF
Construction
Charleston, SC 29414

Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Design
$2,100,000 est. value
Ridgeville, SC 29472

SCC - Giles Campus Stream Stabilization
Infrastructure, Alteration
Bidding
$125,000 to $175,000 est. value
Spartanburg, SC

Fairfield County Commerce Park Speculative Building Pad-Rough Grading
Infrastructure
Post-Bid
SC

Reported 07/14/2022 08:30 AM
Project Title

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville

Physical Address View project details and contacts
City, State (County) Greenville, SC 29613   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Greenville, South Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Laurens Road Swamp Rabbit Trail (SRT) ($1,500,000) - This is a project to provide connection points from surrounding neighborhoods and development nodes to the Swamp Rabbit Trail green line extension pursuant to the Swamp Rabbit Trail Overlay Master plan. The total estimated cost over the three-year period is $3,500,000. This project is in included in the City of Greenville FY 2022-23 Capital Improvement Plan (CIP). As of July 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents