Similar Projects
Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Lining
Results
$175,000 est. value
Sharon Hill, PA 19079

Sanitary Sewer Cleaning
Results
Johnstown, PA 15905

Big Heart Pet Brands Wastewater Improvements
Renovation
Construction
Bloomsburg, PA

Construct a Small Flows Treatment Facility on their Parcel of Land Located Near the Intersection of Meadowood Road and Emery Church Road
Post-Bid
State College, PA

Sanitary Sewer Improvement Project
Results
Masontown, PA

Saint Michael Pennsylvania South of Salix Sewer Extension Project - General
Post-Bid
Forest Hills, PA 15221

Woodland Avenue CCTV Project
Results
Waynesburg, PA

2020-2021 Maintenance of Sanitary Sewer Collection System
Term Contract
Post-Bid
Aliquippa, PA 15001

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Pre-Cast Catch Basins
Post-Bid
Greensburg, PA 15601

Dawson Ridge Sanitary Sewer Rehabilitation
Results
Beaver, PA

Manhole Castings
Post-Bid
Altoona, PA 16601

CDBG Sewer Rehabilitation Project - Phase I
Results
Waynesburg, PA 15370

Last Updated 11/23/2020 01:26 PM
Project Title

Emergency Sewer Main IR and R Contracts for FY21-FY23

Physical Address View project details and contacts
City, State (County) Washington, DC 20032   (District of Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is an indefinite delivery and indefinite quantity (IDIQ) single award Contract. The work includes emergency sewer main infrastructure repair and replacement at various location citywide. The followings are major scope of work included in the Contract but not limited to: 1.Emergency repair work; 2.Repair/Replacement work of various sizes of pressurized and gravity sewers, combined and stormwater drainage systems including limited amount of water mains. Materials include but are not limited to reinforced concrete pipe (RCP), polyvinyl chloride pipe (PVC), ductile iron pipe (DIP) and cast iron pipe (CIP); 3.Items include point repair, trench excavation and backfill, borrow trench backfill, trench undercut excavation, test pits, temporary asphalt, geotextiles, topsoil and seeding of nonpaved surface areas; 4.Reconstruction of existing sewers (CIPP) via the cleaning and lining process including sewer bypass pumping; Ultraviolet cured-in-place sewer lining; Shotcrete lining for sewer rehabilitation; Light and heavy cleaning of sewer lines; Sewer and stormwater main CCTV inspection; Sewer and stormwater manhole rehabilitation; Chemical root treatment and grout injection of sewers; 5.Adjustments of drainage structures including frame and cover; Sewer utility service connections and cleanouts to residential and commercial building The project requires completion within 1096 consecutive calendar days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents