Similar Projects
Eddie Palmer Park Concession Building Project
New Construction
Post-Bid
Marlow, OK

Fusion Storage - Phase 1
New Construction - 63,300 SF
Design
$550,000 est. value
Oklahoma City, OK 73131

Garage Condos
New Construction - 74,170 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Bixby, OK 74008

Distribution Center - Project Koda
New Construction - 270,000 SF
Construction
$25,500,000 est. value
Tulsa, OK 74116

Community Food Bank of Eastern Oklahoma
Renovation, Addition - 132,500 SF
Post-Bid
Tulsa, OK 74106

Integrated Office Building
New Construction - 32,111 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Edmond, OK 73013

Metal Equipment Shelter - 100' X 40' - Street Department
New Construction
Post-Bid
Sapulpa, OK

Fusion Storage - Phase 2
New Construction
Design
Oklahoma City, OK 73131

Distribution Center
New Construction
Design
Lawton, OK - Dallas, TX 75234

East Hefner Road Mixed Use Development - Master Plan
New Construction
Design
Oklahoma City, OK 73131

Construction of Moore Parks Storage Building
New Construction
Post-Bid
Moore, OK

Salt Shed for District 1
New Construction
Post-Bid
Broken Arrow, OK 74014

LPWA Maintenance Barn
New Construction
Post-Bid
Lindsay, OK

Elwood Business Park
New Construction
Conception
Jenks, OK 74037

Reported 09/30/2021 10:28 AM
Project Title

AAA Sisters RV and Boat Storage

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73131   (Oklahoma County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents