Similar Projects
Fifth Avenue Landing Hotel
New Construction - 900,000 SF
Conception
$10,000,000 CJ est. value
San Diego, CA 92101

The Albany Hotel
New Construction - 717,000 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA

Los Angeles Clippers Arena
New Construction
Design
Inglewood, CA 90304

Telegraph Tower
New Construction - 875,000 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94612

Planet Fitness
Renovation - 14,423 SF
Bidding
Los Angeles, CA 90018

The 1860 Los Feliz Mixed Use Development
New Construction, Build-Out
Construction
Los Angeles, CA 90000

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

The Creek at Dominguez Hills
New Construction - 199,000 SF
Conception
$10,000,000 CJ est. value
Carson, CA 90746

Platform 16 Office Complex
New Construction - 1,125,000 SF
Design
$10,000,000 CJ est. value
San Jose, CA

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

Natomas Town Center II East
New Construction
Conception
Sacramento, CA 95834

AC Hotel by Marriott
New Construction
Design
Sherman Oaks, CA 91403

Terracina at Whitney Ranch
New Construction
Conception
$88,000,000 est. value
Rocklin, CA

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Last Updated 08/27/2021 11:49 AM
Project Title

Glo Yoga Studio

Physical Address View project details and contacts
City, State (County) Livermore, CA 94551   (Alameda County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method
Project Status Construction Commenced June 2021, Construction Complete as of August 2021
Bids Due View project details and contacts
Estimated Value $315,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The majority of the space will be the Studio section and in the front will be a lobby, an all gender bathroom and 2 changing rooms. We have already selected the Bamboo flooring and will be providing that. We will be installing/suspending 25 Yoga Panels (parts secured) which are infrared radiant heaters. In between the Yoga Panels we will have linear LEDs running. Most of the lighting will be suspended LEDs (parts secured) and in the bathroom recessed lighting.

Details

Fitness Center, 1,601 SF Build-Out.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents