Similar Projects
CubeSmart Self-Storage / Newnan
New Construction, Infrastructure - 96,000 SF
Conception
$20,000,000 CJ est. value
Newnan, GA 30265

SR 34 Bypass From SR 16 to SR 34
Infrastructure
Design
$2,000,000 CJ est. value
Newnan, GA 30263

Dunaway Gardens
New Construction, Renovation, Infrastructure
Design
$30,000,000 CJ est. value
Newnan, GA 30263

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Line Creek Transmission Main and Distribution System
Infrastructure
Post-Bid
$8,500,000 est. value
GA

Agriculture Meter Installation
Infrastructure
Results

Yamaha Motor SMART Warehouse
Addition, Demolition, Infrastructure - 200,000 SF
Construction
$20,000,000 CJ est. value
Newnan, GA 30263

Highway 16 East Warehouse
New Construction, Infrastructure - 479,520 SF
Pending Verification
$50,000,000 CJ est. value
Newnan, GA 30263

East Gordon Road Warehouse
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Newnan, GA 30263

Lower Fayetteville Road Subdivision
New Construction, Infrastructure
Design
$56,000,000 CJ est. value
Newnan, GA 30263

Old Chicago's Pizza
New Construction - 7,827 SF
Post-Bid
Sharpsburg, GA

Del Webb Active Seniors Community / Newnan
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Newnan, GA 30265

Ashley Park - Phase 3
New Construction, Infrastructure - 55,000 SF
Design
$120,000,000 CJ est. value
Newnan, GA 30263

SR 54 Water Main Relocation at Shoal Creek
Infrastructure
Post-Bid
$450,000 est. value
Newnan, GA

Ishman Ballard Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Newnan, GA 30263

Last Updated 09/28/2022 04:12 PM
Project Title

Water Vault and Backflow Fill Installation

Physical Address View project details and contacts
City, State (County) Newnan, GA 30263   (Coweta County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $219,050 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Coweta County is requesting bids for Water Vault and Backflow Installation. Major items of work consist of: 1) Purchase of all necessary material 2) Install 6" domestic line, 8" fire line, backflow, gate valves, leak detection meter and vault from the main service location 3) Jack & Bore Please see attached advertisement for more details. The Major Items of Work Consist of: 1. Purchasing all necessary material for water vault and backflow per Newnan Utilities specifications and drawings. 2. Installation of 6" domestic line, 8" fire line, backflow, gate valves, leak detection meter and vault from the main service on Greison Trail. 3. Jack and Bore and wet tap service line and fire line into existing 20" D.I.P water main on Greison Trail. Owner reserves the right to accept or reject any or all bids in the best interest of the County. Work is as specified in the Bid Document and is to be done in accordance with detail standards and specifications, where applicable. Each bid must be accompanied by a bid bond prepared on an accepted form, duly executed by the bidder, in the amount of five percent (5%) of the bid. Owner reserves the right to waive any formality or informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner. Owner has the right to add to and delete from the contract once it has been awarded. Award, if award is made, will be to the lowest responsive, responsible bidder. The successful bidder for this contract will be required to furnish a satisfactory performance bond and labor and material payment bond, each in the amount of one hundred percent (100%) of the bid. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents