Similar Projects
Augusta’s Roadways Sweeping Services (Street Sweeping) For Augusta
Bidding
Augusta, GA 30900

Augusta Stormwater Facility Maintenance
Bidding
Augusta, GA 30903

Sidewalk Cleaning
Post-Bid
Sandy Springs, GA 30328

Street Sweeping Services
Term Contract
Post-Bid
Watkinsville, GA 30677

Vacant Lot Cleaning Services
Term Contract
Results
Augusta, GA 30900

General City Maintenance
Results
Flemington, GA

Athletic Field Maintenance
Bidding
Kennesaw, GA

T32 - District 1 Sweeping and Drain Cleaning
Post-Bid

Roswell Street and Waddell Street Streetscape Improvements
Results
Marietta, GA 30061

Commercial Sweeper Services for Parking Lot
Term Contract
Post-Bid
Alpharetta, GA 30009

As-Needed Vacant Lot Cleaning
Results
Atlanta, GA 30336

Dust Control Services
Term Contract
Post-Bid
Woolsey, GA 30214

Sweeping of Curbs and Intersections
Term Contract
Results
Lawrenceville, GA 30046

T32 - Sweeping and Drain Cleaning District 7
Post-Bid

Parking Lots Sweeping Services
Results
Atlanta, GA 30324

Last Updated 03/19/2021 12:26 PM
Project Title

Facilities Support Service Provider

Physical Address View project details and contacts
City, State (County) Cleveland, Sautee Nacoochee, GA 30528   (White County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Services Provided: Custodial Services Electrical Services HVAC Services Plumbing Services General Repair Services General Landscape Maintenance Services Athletic Field Maintenance Services Pest Control Maintenance Services Energy Management Services

Details

Division 01 - General Requirements, Special Procedures, Indoor Air Quality Procedures, Quality Assurance, Temporary Controls, Temporary Pest Control, Cleaning and Waste Management.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 14 - Conveying Equipment, Electric Traction Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Packaged Generator Assemblies.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents