Similar Projects
Pearl River County MSU Extension Building
New Construction, Infrastructure
Bidding
$1,250,000 CJ est. value
Poplarville, MS 39470

Bridge and Approaches on the Pine Grove Road
New Construction, Infrastructure
Post-Bid
Picayune, MS 39466

Portland Cement Material and Roadbed Reclamation 2022 County Wide (Various Roads)
Infrastructure
Post-Bid
MS

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

Mill and Overlay Approximately 7 Miles on I-59 from 1600' South of the Hillsdale Rd. Interchange to the Lamar County Line
Infrastructure
Results

Airfield Pavement Upgrades
Infrastructure
Post-Bid
$200,000 CJ est. value
Poplarville, MS 39470

Bridge Repair on SR 607 over I-59 (Bridge No. 19.4)
Renovation
Results
MS

Fields 1, 2, 3, and 4 Synthetic Turf Infields and Fields 5, 6, 7, and 8 Synthetic Turf Infields and Regrading of Outfield Slope
Infrastructure
Post-Bid
$1,452,315 CJ est. value
Picayune, MS 39466

Hot Mix Asphalt Overlay
Infrastructure
Results
MS

Campus-Wide Paving Project - 2022
Infrastructure
Post-Bid
$200,000 CJ est. value
Poplarville, MS 39470

Thin Lift Overlay approximately 9 miles on SR 26
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Poplarville, MS 39470

Southeast Volunteer Fire Department (VFD) - Station No.2 New Truck Storage Building
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Picayune, MS 39466

Bridge and Gravel Approaches on the Shorty Burgess Road
New Construction, Infrastructure
Results
$300,000 est. value
Picayune, MS 39466

Picayune Multi-Purpose Westside and Southside
Renovation, Infrastructure
Post-Bid
$700,000 CJ est. value
Picayune, MS 39466

Pearl River County MSU Extension Building Site Development
Infrastructure
Results
$180,839 CJ est. value
Poplarville, MS 39470

Last Updated 03/19/2023 03:04 AM
Project Title

Bridge Replacement on SR 43 over Hogpen Branch

Physical Address View project details and contacts
City, State (County) Poplarville, MS 39470   (Pearl River County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,745,358 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Replacement on SR 43 over Hogpen Branch (Bridge No. 33.0), known as Federal Aid Project No. STP-0032-01(036) / 106973301 in Pearl River County Value Estimate Range -$1,000,000 - $5,000,000 SM No. CSTP0032010361 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. The Mississippi Department of Transportation hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for an award. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. Bid bond, signed or countersigned by a Mississippi Resident Agent or qualified non-resident agent, with Power of Attorney attached or on file with the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for five (5%) percent of bid, payable to STATE OF MISSISSIPPI, must accompany each proposal. MSDOT - 03- Bridge Replacement on SR 43 over Hogpen Branch *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (27.7%), WBE (6.9%), DBE (1%)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents