Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Construction of a Middle School Obstacle Course
Infrastructure
Design
Cody, WY 82414

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Rading, Bituminous Pavement Surfacing, Slide Stabilization Rock, Aggregate Columns, Temporary Concrete Barriers and Miscellaneous Work
Infrastructure
Results
WY

Grading, Milling Plant Mix, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road
Infrastructure
Conception
$1,250,000 CJ est. value
Cody, WY 82414

56--Yell-Friction Seal Fy22
Term Contract
Post-Bid
Yellowstone National Park, WY 82190

Bituminous Pavement Surfacing
Infrastructure
Results
WY

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Last Updated 04/13/2023 02:09 PM
Project Title

Lewis & Clark Parking Lot Reconstruction

Physical Address View project details and contacts
City, State (County) Powell, WY 82435   (Park County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Northwest College reserves the right to reject any and/or all bids and to waive any informalities if deemed in the best interest of the Owner. No bid may be considered unless accompanied by the required bid guarantee of 5% of the total bid amount, which amount shall be forfeited if the bidder is awarded the Contract and fails to enter into a Contract with the Owner. Successful bidder will be required to provide payment and performance bonds in an amount of at least 100% of awarded contract price Pursuant to W.S. 16-6-106, preference is hereby given to materials, supplies, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming, or supplied by a resident of the state, quality being equal to articles offered by the competitors outside of the state. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS: $800,000 to $ 900,000 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 04/06/2023 Work of the Project includes: 1. Demolition of the existing asphalt parking lot and ancillary areas serving the Lewis & Clark Hall, and Vehicle Maintenance building. 2. Reconstruction of the parking lot and accesses. 3. Construction of new storm drain. 4. Construction of new exterior lighting, fed from improvements within the Vehicle Maintenance building. 5. Other improvements including fencing, striping, signage, wheel stops, etc.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents