Similar Projects
Hanna Park - Dolphin Plaza - Floor and Walls
Demolition, Alteration
Bidding
Jacksonville, FL 32233

Antimicrobial Surfacing of the Franklin County Jail
Alteration
Bidding
Eastpoint, FL 32328

Annual Contract - Flooring
Term Contract
Post-Bid
$100,000 to $2,000,000 est. value
West Palm Beach, FL 33411

Fire Training Tower Concrete Floor Replace and Repair
Post-Bid
Titusville, FL 32780

The Federal Aviation Administration (FAA) has a requirement for the removal and replacement of the existing vinyl composite tile (VCT) and carpet from the PIE Base located At the St. Petersburg International Airport Air Traffic Control Tower.
Results
$15,000 to $25,000 est. value
Clearwater, FL 33762

Corrections Phoenix and Vo-Tech Flooring Replacement
Results
Less than $450,000 est. value
Orlando, FL 32839

Contracted Specialty Floor Covering
Alteration
Bidding
FL

Goodlet Adult Center Renovation - Vinyl Flooring, Porcelain Tile and Wood
Post-Bid
Hialeah, FL 33012

Sanding, Painting, and Recoating of Gymnasium Floor
Results
Daytona Beach, FL 32114

Floor Covering Services
Alteration
Bidding
FL

Key Largo Public Library IRMA Carpet Repairs
Post-Bid
Key Largo, FL 33037

FCI Gym Floor
Results
Marianna, FL 32446

Hardwood Synthetic Sports Flooring
Post-Bid

Flooring IDIQ
Results
Tampa, FL 33621

Floor Refurbishment
Post-Bid
Jacksonville, FL 32202

Reported 12/23/2021 12:00 AM
Project Title

Springfield Water Lab Flooring Replacement

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32206   (Duval County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade of flooring at JEA’s Springfield Water Lab located at 1002 N Main Street, Jacksonville, FL 32206. Remove existing vinyl flooring in sections starting with all of the white hallways followed by Rooms 115,116,117,128,130,131, 137, 138, 139 and 140. This includes flooring, curbing 4” up walls with top trim to maintain sealed flooring throughout the first floor laboratory areas and hallways. Replace damaged sub flooring as required. Rm 131 has been noted having subfloor damage. Plastic Isolation/Dust curtains need to be installed between work spaces and operating Labs where door can not be used for isolation. Rooms to be completed will depend on the bids provided by vendors. Armstrong Medintone Commercial Vinyl Sheet Flooring will be installed to match existing flooring colors or as selected by JEA Staff. The intent is to limit to white and grey colors for flooring (shades to be determined) unless variance is requested. If a variance is requested any modifications to flooring will be selected by Lab Managers.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents