Similar Projects
SOMA Terrace Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
Bentonville, AR 72712

Locust Street and Drainage Improvements
Infrastructure
Bidding
$300,000 est. value
Cabot, AR

Construction of the Delta Woodlands Biking / Walking Trail Improvements
Infrastructure
Bidding
$300,000 est. value
Lake Village, AR

Rockport Walking Trail
Infrastructure
Post-Bid
Rockport, AR

Construction for ASU Loop Trail Phase 2
Infrastructure
Post-Bid
Jonesboro, AR

Magnolia High School Drive Sidewalk
Results
Less than $127,000 est. value
Magnolia, AR 71753

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Ramsey Village Apartments
New Construction, Alteration
Pending Verification
$21,000,000 est. value
Fayetteville, AR 72704

Installation of Adaptive Signal Control Technology
Infrastructure
Bidding
$400,000 est. value
Conway, AR 72034

Sidewalks and ADA Parking
Infrastructure
Post-Bid
Crossett, AR

I-40 Truck Parking Expansion Project (West Memphis)
Results
AR

West Van Buren Street (TAP-18) Eureka Springs
Infrastructure
Bidding
$330,000 est. value
Eureka Springs, AR 72631

Construction of City Hall Parking Improvements with Detention
Infrastructure
Post-Bid
Maumelle, AR 72113

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Nashville - 4th Street Sidewalks Phase 2
Infrastructure
Post-Bid
Nashville, AR

Reported 07/08/2022 12:00 AM
Project Title

Hope Downtown Streetscaping (Tap-19) (S)

Physical Address View project details and contacts
City, State (County) Hope, AR   (Hempstead County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: I-30 traveling west, take exit 30 for US-278 E, turn left onto US-278 E/ N Hervey St, travel southeast to the intersection of S Hervey St. and W 2nd Street. This is the beginning of the project area. The project includes approximately 3 blocks of new sidewalk with brick buffer construction as well as installing new street lights as shown on the plans. The major items of work include, but are not limited to, 1,092 L.F. of roadside improvements including: 538 S.Y. of new sidewalk, 292 S.Y. of brick pavers, 938 L.F. of curb and gutter, 263 S.Y. of portland cement concrete base, 198 S.Y. of pedestrian ramps, 56 L.F. of R.C. pipe, and 34 new street lights as shown on the plans and indicated in the specifications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents