Similar Projects
Christophers Crossing Corridor - West Side Extension - 310006 - City of Frederick
Infrastructure
Conception
$15,000,000 est. value
Frederick, MD 21702

West Patrick Street Resurfacing With Full Depth Repairs - 320041 - City of Frederick
Infrastructure
Conception
$1,000,000 est. value
Frederick, MD 21709

Parking Lot Repair at Frederick Readiness Center, Frederick, Maryland
Infrastructure
Bidding
$100,000 est. value
Frederick, Ijamsville, MD 21754

B1021 Parking Lot Expansion
Alteration
Post-Bid
Fort Detrick, MD

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Replacement and Repairs of Sidewalk and Americans With Disabilities Act (ADA) Ramps (FY2022)
Results
Frederick, MD

Brunswick Heritage Museum Facade Restoration
Results
Brunswick, MD 21716

Richard W. Kanode Farm Park - PR1036 - Frederick County
New Construction, Infrastructure
Conception
$3,930,180 est. value
Frederick, MD

Doubs Meadow Park Sidewalk Extension
Infrastructure
Post-Bid
Myersville, MD 21773

ADA Compliance Curb Ramps Project
Results
Emmitsburg, MD

Fair Hill NRMA Phase 4 Paving
Results
Less than $50,000 est. value
Elkton, MD 21921

Street Repair Services
Alteration
Results

Monument Road Repaving at DNR Washington Monument State Park
Infrastructure
Results
$500,000 to $1,000,000 est. value
Middletown, MD 21769

Sidewalk Repairs
Infrastructure
Results
New Market, MD

ADA Curb Ramps (CDBG Grant)
Infrastructure
Results
$100,001 to $500,000 est. value
Frederick, MD

Reported 06/28/2022 12:32 PM
Project Title

Work Release Parking Lot Expansion - GG1158

Physical Address View project details and contacts
City, State (County) Frederick, MD 21704   (Frederick County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $368,311 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Due to the anticipated increase in vehicular traffic from the upcoming Detox Services project, additional parking will be required at the Work Release Center. This project will include an axillary parking lot, on the adjacent side of Marcies Choice Lane, and will provide approximately 30 additional parking spaces. As of June 27, 2022, this project is currently in the FY 2023-2038 CIP. Funding for this project is allotted in the couny's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents