Similar Projects
Construction of NAWS South Prairie Reservoir and Control Structure -Electrical
Alteration
Bidding
$14,600,000 est. value
Bismarck, ND

Traffic Counters
Post-Bid
$75,000 est. value

Plugging Wells
Term Contract
Post-Bid

Meeting Room Matrix & Cabling
New Construction
Results
Bismarck, ND

Boiler Upgrade at Fire Station #1
Renovation
Results
Bismarck, ND 58501

Wiring and Fiber Placement Services
Term Contract
Post-Bid

RV Pedestal Improvements
Alteration
Results
Bismarck, ND 58504

Well Equipment Removal Package 1
Demolition
Post-Bid

Reclamation of Wells - Package 1
Infrastructure
Results
Bismarck, ND

Well Equipment Removal Package 2
Demolition
Post-Bid

Reclamation of Wells - Package 2
Infrastructure
Results
Bismarck, ND

Well Equipment Removal Package 3
Alteration
Post-Bid
Bismarck, ND

Reclamation of Wells - Package 3
Infrastructure
Results
Bismarck, ND

Access Control Improvements RJB Complex - Electrical
Alteration
Post-Bid
Bismarck, ND

Reclamation of Wells - Package 4
Infrastructure
Results
Bismarck, ND

Last Updated 11/04/2021 12:23 PM
Project Title

Water Treatment Plant High Lift Pump No. 5 Replacement and Electrical Improvements

Physical Address View project details and contacts
City, State (County) Bismarck, ND 58504   (Burleigh County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes, but is not limited to, the following work: High Lift Pump No. 5 Replacement & Electrical Improvements: 1. All labor, equipment, materials, and services necessary to perform the work of replacing an existing high lift pump with a new vertical turbine pump. Furnish and install miscellaneous piping, valves, and appurtenances to complete the installation of equipment as shown in the contract documents. 2. Electrical upgrades including new transformer, conductors, conduit, and variable frequency drives (VFDs). 3. Portions of SCADA programming are to be completed by the Owner. This includes receiving signals and displaying the information on the City’s system. Contractor is required to provide and route control wiring to establish specified control loops. 4. Removal, salvaging, and replacement of landscaping rock, plantings, and edging. Finish grading of areas to be seeded that were disturbed during construction. City will replace sod in seeded areas disturbed during construction 5. Site cleanup, any building restoration, and all other miscellaneous work required, not herein mentioned, but inferred from the construction contracts.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents