Similar Projects
Warner Natatorium Pool Deck Remediation
Infrastructure
Post-Bid
Kirtland, NM 87417

Tierra Amarilla Recreational Swimming Pool Repairs
Infrastructure
Post-Bid
$52,000 est. value
Tierra Amarilla, NM 87575

Milan Pool Refurbishment
Infrastructure
Bidding
$250,000 est. value
Milan, NM 87021

Raton Aquatic Center Repairs and Maintenance Project
Infrastructure
Results
$60,000 est. value
Raton, NM 87740

Pool Climbing Wall
Term Contract
Results
Holloman Air Force Base, NM

Regional Recreation and Aquatic Center - Phase II - Competitive Pool Enclosure - City of Las Cruces
Alteration
Conception
$9,654,633 est. value
Las Cruces, NM

Construction of Kiddie/Multigenerational Pool at the Larry R. Walkup Aquatic Center
Construction
Los Alamos, NM 87544

Journal Center Lofts
New Construction - 12,672 SF
Construction
Albuquerque, NM 87109

Markana Uptown
New Construction - 589 SF
Pending Verification
Less than $500,000 CJ est. value
Albuquerque, NM 87110

Lions Pool Replaster and Deck Resurfacing
Infrastructure
Results
$100,000 to $200,000 est. value
Farmington, NM 87401

The Pine Needle at Winrock
New Construction
Design
$45,000,000 est. value
Albuquerque, NM 87110

Village at Las Soleras Apartments
New Construction, Infrastructure
Post-Bid
Santa Fe, NM 87505

Repair of Swimming Pool Interior
Infrastructure
Results
Less than $72,000 est. value
Lordsburg, NM

Modifications to Swimming Pool
Alteration
Post-Bid
Mora, NM

Aquatic Center Deck Resurfacing
Infrastructure
Results
$165,000 est. value
Farmington, NM 87401

Reported 06/22/2022 08:16 AM
Project Title

Regional Recreation and Aquatic Center - Phase II - Competitive Pool Construction - City of Las Cruces

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88001   (Dona Ana County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $6,586,617 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Regional Recreation and Aquatic Center - Phase II - Competitive Pool Construction A detailed scope has not yet been determined This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents