Last Updated 01/13/2021 05:01 AM
Project Title

Reconstruction/Rehabilitation - District 1

Physical Address View project details and contacts
City, State (County) (Kershaw, Lee Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 3,726.840 Sy Borrow Excavation 2,986.000 Cy Excavation For Shoulder Paving 334.752 Sta Hauling Of Excavated Shoulder Material 334.752 Sta Cement Modified Recycled Base (8" Unif)-Curing Method b 113,125.000 Sy Portland Cement For Cement Modified Recycled Base Course 3,055.500 Ton Maintenance Stone 49.500 Ton Hma Shoulder Widening Course 2,510.640 Ton Liquid Asphalt Binder Pg64-22 1,851.216 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,300.000 Sy Full Depth Asph. Pav. Patching 8" Unif 3,650.000 Sy Milling Existing Asphalt Pavement 1.0" 11,600.000 Sy Milling Existing Asphalt Pavement 2.0" 118,300.000 Sy Milling Existing Asphalt Pavement (Variable) 11,120.000 Sy Milled-In Rumble Strip 17.080 Mi Hot Mix Asphalt Surface Course Type b 12,510.734 Ton Hot Mix Asphalt Surface Course Type c 13,944.660 Ton Hot Mix Asphalt Surface Course Type d 2,878.880 Ton Driveway Paving-Surface Type c 821.000 Ton Driveway Paving-Surface Type d 25.500 Ton Permanent Construction Signs (Ground Mounted) 2,653.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 26,640.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 150.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 575,670.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 8,400.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 7,890.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 5,943.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 42.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-Fast Dry Paint 42.000 Ea White Word Message "Only"-Fast Dry Paint 27.000 Ea Railroad Crossing Symbols - Fast Dry Paint 2.000 Ea Bike Lane Symbol - Fast Dry Paint 21.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 48,000.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 456,360.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 600.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 400.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 8,180.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 50.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 22,520.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 2,800.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 2,320.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 20.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,100.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 14.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 9.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 7,000.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 38,330.000 Lf 8" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 200.000 Lf Bike Lane Symbol -Preformed Thermo - 60mil 7.000 Ea Bike Lane Arrow - Preformed Thermo - 60mil 14.000 Ea Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 441.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 810.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,844.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 724.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 153,200.000 Lf 8" White Solid Lines-(Cross Walk & Channelization)-Single Component Hybridized Polymer–20 Mils 370.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Sc Hybridized Polymer- 20mil 002 40.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 839.000 Lf Railroad Crossing Symbols - Single Component Hybridized Polymer - 20 Mils 2.000 Ea 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 8,550.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 107,620.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 385.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Gray 390.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 325.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 9,474.000 Lf Sawcut For Loop Detector 3,249.000 Lf f&i-12"x12"x12"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 8.000 Ea Furnish & Install 1/4" Galvanized Steel Cable 145.000 Lf Catch Basin Type 1 (Top Only) 1.000 Ea Adjust Drop Inlet Adjust d. i. 3.000 Ea Concrete Curb And Gutter(1`-6") Vertical Face 2,735.000 Lf Concrete Sidewalk(4" Uniform) 1,117.000 Sy Detectable Warning Material 1,075.000 Sf Pedestrian Ramp Construction 2,150.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 14.547 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents