Similar Projects
Smoke Shack BBQ
Renovation - 888 SF
Design
Walker, MI 49534

Reconstruction of and Water Main in the Ottawa Avenue/Coldbrook Street/Monroe Avenue Intersection (Decommissioning of Coldbrook Pumping Station)
Alteration
Bidding
$2,959,380 est. value
Grand Rapids, MI

Paving & Site Lighting
Post-Bid

Concrete Pads - Bus Stop Improvement Projects
Post-Bid
MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Supply System Extension Area 3 - Herrington Avenue, Sprucewood Drive, Sprucewood Court, Meek Drive, Korben Woods Court, Terrie Lynn Drive, Frond Street, Pine Hill Drive and Belmont Avenue
Results
Belmont, MI

One Way Auto Sales - Parking Lot Expansion
Addition - 20,000 SF
Pending Verification
Grand Rapids, MI 49507

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2.17 MI of Hot Mix Asphalt Reconstruction and Bridge Rehabilitation
Results
MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Systematic Sidewalk Repair at VARIOUS LOCATIONS - 2021-1
Results
Less than $298,060 est. value
Grand Rapids, MI

Water Supply System Extension Area 8A - Herrington Avenue and 10 Mile Road
Infrastructure
Post-Bid
Belmont, MI

Systematic Sidewalk Repair at VARIOUS LOCATIONS - 2021-2
Results
Less than $298,060 est. value
Grand Rapids, MI

GRCC ATC Piazza Stair and Ramp Addition
Infrastructure, Alteration
Post-Bid
Grand Rapids, MI 49503

Systematic Sidewalk Repair at VARIOUS LOCATIONS - 2021-3
Results
Less than $298,060 est. value
Grand Rapids, MI

Last Updated 07/18/2022 07:57 AM
Project Title

Reconstruction of Plainfield Avenue From Marywood Drive to Ellsmere Street

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49525   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,113,931 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of duel water main replacement, pressure district changes, water service replacement, road replacement, ADA and minor storm upgrades.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents