Similar Projects
Gaoa Big Hole Recreation Site Renovations, Montana
Term Contract
Design
$500,000 to $1,000,000 est. value
Butte, MT 59707

Marias River WMA 2022 Clark Access Gravel
Infrastructure
Bidding
$110,000 est. value
Shelby, MT 59474

Deadmans' Supply Canal Rehabilitation
Alteration
Post-Bid
MT

Sanding Material 1A-Location Butte Area
Infrastructure
Post-Bid
Butte, MT

204 Grandview Dr - Reserve Dr Upgrades
Alteration
Results
Kalispell, MT

Sanding Material 2-Locations Bozeman Area
Infrastructure
Results
Bozeman, MT

Sanding Material 1B-Location Missoula Area
Infrastructure
Post-Bid
Missoula, MT 59808

Tiber Dam Shoreline Material Supply
Term Contract
Results
Chester, MT 59522

Sanding Material 1B-Location Butte Area
Infrastructure
Post-Bid
MT

Sanding Material 2-Locations Butte Area
Infrastructure
Post-Bid
Butte, MT

Sanding Material 1-Location Butte Area
Infrastructure
Post-Bid
Butte, MT

Sanding Material 1-Location Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Sanding Material 1-Location Lewistown Area
Infrastructure
Post-Bid
Lewistown, MT

Sanding Material 2-Locations Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Sanding Material 1A-Location Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Reported 07/07/2022 12:00 AM
Project Title

Padden Pit 2022

Physical Address View project details and contacts
City, State (County) Hammond, MT 59332   (Carter County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cater County is seeking bids for gravel crushing at the Padden gravel pit. The Padden pit is located at the South Dakota state line near the end of Tie Creek RD. Carter County is looking to crush 50,000 yds. All rock must be crushed to 1" and all rock must be crushed. Topsoil will be stripped by Carter County. Work must be completed by October 1. 2022.

Details

Division 32 - Exterior Improvements, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents