Last Updated | 10/31/2022 08:33 PM |
Project Title | 2023 Door Replacement Work |
Physical Address | View project details and contacts |
City, State (County) | Melrose Park, IL 60160 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Copy Center - 10/13/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable Board of Education, Maywood-Melrose Park-Broadview School District 89, Melrose Park, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in-formalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Attendance shall be taken at the site to ensure that all contractors have visited the site. Completion Date: August 4, 2023. The Project consists of exterior door/curtain wall replacement and interior door/frame/keying replacement at multiple schools listed below for Maywood-Melrose Park-Broadview School District 89, 906 Walton Street, Melrose Park, IL, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by StudioGC, dated October 13, 2022. 1. Emerson Elementary School, 311 Washington Blvd., Maywood, IL 60153 2. Garfield Elementary School, 1514 S. 9th Ave., Maywood, IL 60153 3. Irving Middle School, 805 S. 17th Ave., Maywood, IL 60153 4. Jane Addams Elementary School, 910 Division Street, Melrose Park, IL 60160 5. Lincoln Elementary School, 811 Chicago Ave., Maywood, IL 60153 6. Melrose Park Elementary School, 1715 W. Lake Street, Melrose Park, IL 60160 7. Roosevelt Elementary School, 1927 S. 15th Ave., Broadview, IL 60155 8. Stevenson Middle School, 1630 N. 20th Ave., Melrose Park, IL 60160 9. Washington Dual Language Academy, 1111 Washington Blvd., Maywood, IL 60153 B. Scope: The Work includes the work of all trades required; and all the labor, materials, and equipment necessary and incidental to the construction and completion of the Work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |