Similar Projects
Springfield Township Multimodal Trail Phase 2
Infrastructure
Conception
Grove City, PA 16127

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Asphalt Surface Treatment
Post-Bid
Mercer, PA

CDBG Roadway Improvements
Results
Hermitage, PA 16148

2021 Street Improvement Project
Results
Sharpsville, PA 16150

Major Bridge P3
New Construction
Post-Bid

South Darby Road Stormwater and Roadway Improvements Project
Results
Hermitage, PA 16148

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2020 Neighborhood Investment Program
Results
Hermitage, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Pavement Surface and Superpave Wearing Course
Results
Sharpsville, PA

300 Tons Superpave Wearing Course
Infrastructure
Post-Bid
Grove City, PA

SR 1002 Bridge / Otter Creek
Results
$500,000 to $999,999 est. value
PA

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Bituminous Seal Coat Surface
Results
Greenville, PA

Last Updated 06/08/2022 09:35 AM
Project Title

Clintonville Road Bridge over I-79

Physical Address View project details and contacts
City, State (County) Jackson Center, PA   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the construction of approximately 0.19 mile from SR 2102/Segment 0010/Offset 0000 to SR 2102/Segment 0010/Offset 0146, SR 2102/Segment 0020/Offset 0000 to SR 2102/Segment 0020/Offset 0139, SR 2104/Segment 0010/Offset 0000 to SR 2104/Segment 0010/Offset 0228, T-479/Station 0+90.00 to T-479/Station 9+81.00, and T-607/Station 17+81.25 to T-607/Station 22+18.75, including partial removal of three existing multi-span structures, repair and rehabilitation of existing structures over Interstate 79, approach roadway improvements including paving with Superpave asphalt mixtures, drainage, guiderail, and delineators as indicated on the approved drawings included in the Bid Package.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents