Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

Coffee Campus Cooling Tower Replacement
Renovation
Bidding
$200,000 CJ est. value
Douglas, GA 31533

Awtrey Middle School HVAC Upgrade, Phase 2
Renovation
Sub-Bidding
$650,000 CJ est. value
Kennesaw, GA 30144

Berrien Middle School Corridor HVAC
Renovation
Sub-Bidding
$300,000 CJ est. value
Nashville, GA 31639

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

35 Broad Street Infrastructure Upgrades
Alteration
Post-Bid
Less than $1,400,000 est. value
Atlanta, GA

Design Build Services for The Replacement/Refurbishment of AHUs and Associated Fans
Results
GA

Courthouse HVAC
Alteration
Results
Ringgold, GA 30736

Rome High School Natatorium HVAC Renovation
Alteration
Post-Bid
$500,000 est. value
Rome, GA 30161

HVAC Replacement
Infrastructure
Results
Cumming, GA 30040

CCSD ERU Replacements
Alteration
Post-Bid
Evans, GA 30809

Multiple HVAC Replacements at Multiple County Locations
Alteration
Results
$377,606 est. value
Canton, GA 30114

On-Call HVAC Maintenance and Repair Services
Alteration
Post-Bid
Savannah, GA

Napoleon Fielder Recreation Center - Air Conditioning Replacement
Alteration
Results
Rome, GA 30161

HVAC Replacement for the Macon Housing Authority Central Office
Alteration
Post-Bid
Macon, GA 31201

Last Updated 04/26/2023 01:08 AM
Project Title

Harmony Elementary School - HVAC Renovations (ERU And RTU Replacement)

Physical Address View project details and contacts
City, State (County) Buford, GA 30519   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 30, 2022. The Bid for the Harmony Elementary School HVAC Renovation Project is cancelled. The scope of work for the project will be modified, and the project will be advertised for bid at a later date. ERU Contract, if awarded, will be on a stipulated sum basis for the project listed above. No bids may be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to GWINNETT COUNTY BOARD OF EDUCATION, in the amount equal to five percent (5%) of the base bid, (certified checks are NOT acceptable). Performance Bond, and Labor and Material Payment Bond, each in amounts equal to 100% of the Contract Sum, will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia be listed on the Department of Treasury Circular 570, and have an A. M. Best Company rating of minimum Class A , with financial size VI or better. A Payment Bond and a Performance Bond, in the amount 100% of the value of the respective subcontractors work, will be required of the Fire Proofing, Mechanical/HVAC, Plumbing, Sprinkler, Electrical, and Roofing Subcontractors. While bidders are not required to be licensed General Contractors all bidders must be licensed in the State of Georgia and furnish to the Architect a completed Contracts Qualification Statement (AIA Document A305) to be evaluated by Owner and Architect prior to obtaining bidding documents. Plans and Specifications will not be released prior to approval. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractors ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified. Any bidder that is disqualified may respond to the Owner in writing within twenty (20) days of the Notice of Disqualification indicating why said Bidder feels the disqualification is unfounded. The written appeal from the disqualified bidder will not change the decision already made on this project; however, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett County School System projects. In any case, the Owners decision shall be deemed final. Time is of the essence. A written Notice to Proceed will be issued after the Pre-Construction Conference upon acceptance and approval of all Contracts, Bonds, Insurance, etc. Contractor shall mobilize within ten (10) days of the date of the written Notice to Proceed. The start date for the work will be May 25, 2023. All work outlined in the Contract Documents must be substantially complete by July 21, 2023. The Owner will make paymentsto the successful Contractor upon receipt of Requestsfor Payment, approved by the Architect, as fully covered and shown in the Contract Documents. Retainage and described in the specifications and General Conditions of the Contract will be withheld. The above description is an advertisement for submission of bids; bids are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents